Gerenciamento de projetos voltado para acreditação hospitalar: estudo de caso

Aim:  describe  the  implementation  of  Project  Managing  techniques, based  on  the  propositions  of  the  Project  Management  Body  of  Knowledge  (PMBOK), which was used on a Sterilization Central Supply, to help it meet the quality standards needed  to  get  accredited.  Methods:  a  descrip...

Full description

Saved in:
Bibliographic Details
Published in:Online Brazilian journal of nursing Vol. 15; no. 1; p. 96
Main Authors: Freire, Elana Maria Ramos, Batista, Renata Cristina Rocha, Martinez, Maria Regina
Format: Journal Article
Language:English
Published: 16-04-2016
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Aim:  describe  the  implementation  of  Project  Managing  techniques, based  on  the  propositions  of  the  Project  Management  Body  of  Knowledge  (PMBOK), which was used on a Sterilization Central Supply, to help it meet the quality standards needed  to  get  accredited.  Methods:  a  descriptive  case  study.  Participant  observation, document analysis and a structured questionnaire were used to collect data. Results: the development  and  management  of  the  project  actions  were  based  on  eight  PMBOK knowledge   areas   -   Project   Integration,   Scope,   Time,   Quality,   Human   Resource, Communications,  Risk  and  Stakeholder  Management.  Conclusion:  project  management made it possible to implement the project at the expected time and scope, meeting the quality  standards,  and  allowing  the  team  to  better  engage  and  compromise  to  the project.
ISSN:1676-4285
1676-4285
DOI:10.17665/1676-4285.20165158