DAΦNE Φ-factory upgrade for Siddharta run
An upgrade of the ΦNE Φ-Factory at LNF is planned in view of the installation of the Siddharta detector in fall 2007. A new interaction region suitable to test the large Piwinski angle and crab waist (CW) collision schemes will be installed. Other machine improvements, such as new injection kickers,...
Saved in:
Published in: | 2007 IEEE Particle Accelerator Conference (PAC) pp. 66 - 68 |
---|---|
Main Authors: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
Format: | Conference Proceeding |
Language: | English |
Published: |
IEEE
01-06-2007
|
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | An upgrade of the ΦNE Φ-Factory at LNF is planned in view of the installation of the Siddharta detector in fall 2007. A new interaction region suitable to test the large Piwinski angle and crab waist (CW) collision schemes will be installed. Other machine improvements, such as new injection kickers, bellows and beam pipe layouts will be realized, with the goal of reaching luminosity of the order of 10 33 /cm 2 /s. The principle of operation of the new scheme, together with hardware designs and simulation studies, are presented. |
---|---|
ISBN: | 1424409160 9781424409167 |
ISSN: | 1944-4680 2152-9582 |
DOI: | 10.1109/PAC.2007.4440138 |