PROcess for the Design of User-Centered Environments (PRODUCE): Guiding Change in the Health Care Environment

Changes in the physical environments of health care settings have become increasingly common to meet the evolving needs of the health care marketplace, new technologies, and infrastructure demands. Physical environment change takes many forms including new build construction, renovation of existing...

Full description

Saved in:
Bibliographic Details
Published in:Advances in health care management Vol. 18
Main Authors: Ray, Jessica M, Berg, Rebecca, Sudikoff, Stephanie N
Format: Journal Article
Language:English
Published: Netherlands 24-10-2019
Subjects:
Online Access:Get more information
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Changes in the physical environments of health care settings have become increasingly common to meet the evolving needs of the health care marketplace, new technologies, and infrastructure demands. Physical environment change takes many forms including new build construction, renovation of existing space, and relocation of units with little to no construction customization. The interrelated nature of the complex socio-technical health care system suggests that even small environmental modifications can result in system-level changes. Environmental modifications can lead to unintended consequences and introduce the potential for latent safety threats. Engaging users throughout the change lifecycle allows for iterative design and testing of system modifications. This chapter introduces a flexible process model, PROcess for the Design of User-Centered Environments (PRODUCE), designed to guide system change. The model was developed and refined across a series of real-world renovations and relocations in a large multihospital health care system. Utilizing the principles of user-centered design, human factors, and in-situ simulation, the model engages users in the planning, testing, and implementation of physical environment change. Case studies presented here offer exemplars of how to modify the model to support individual project objectives and outcomes to assess at each stage of the project.
ISSN:1474-8231
DOI:10.1108/S1474-823120190000018002