Preparation of acceptance tests and criteria for the Test Blanket Systems to be operated in ITER
•Initial guideline for acceptance testing and acceptance criteria for Test Blanket Systems in ITER.•These tests complement those required by the applicable codes and standards, and regulations.•Completion of TBS manufacture will be followed by Factory Acceptance Testing, prior to shipment.•Next step...
Saved in:
Published in: | Fusion engineering and design Vol. 98-99; pp. 1889 - 1892 |
---|---|
Main Authors: | , , , , , , , , , |
Format: | Journal Article |
Language: | English |
Published: |
Elsevier B.V
01-10-2015
|
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | •Initial guideline for acceptance testing and acceptance criteria for Test Blanket Systems in ITER.•These tests complement those required by the applicable codes and standards, and regulations.•Completion of TBS manufacture will be followed by Factory Acceptance Testing, prior to shipment.•Next steps are “Reception Inspection Tests”, and on-site pre-installation and components tests.•This guideline allows the detailing of the TBS specific test plans and their scheduling.
This paper describes the main acceptance criteria and required acceptance tests for the components of the six Test Blanket Systems to be installed and operated in ITER. It summarizes the guide-line toward the establishment of detailed test plans for the TBS, starting from the end-product at the ITER Members factories, and to generally define the type of tests that have to be performed on the ITER site after shipment, and/or prior to the systems final commissioning phase. |
---|---|
Bibliography: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 23 |
ISSN: | 0920-3796 1873-7196 |
DOI: | 10.1016/j.fusengdes.2015.04.019 |