Construction Cost Budget Control Based on the Dynamic Distributed Clustering Algorithm

In order to improve the effect of construction cost budget control, this paper applies the dynamic distributed clustering algorithm to the analysis of project cost budget data and proposes a two-stage strategy iterative algorithm to obtain the iterative control law and iterative performance index fu...

Full description

Saved in:
Bibliographic Details
Published in:Advances in multimedia Vol. 2022; pp. 1 - 10
Main Authors: Li, Junqing, Li, Yongbing
Format: Journal Article
Language:English
Published: New York Hindawi 04-07-2022
Hindawi Limited
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In order to improve the effect of construction cost budget control, this paper applies the dynamic distributed clustering algorithm to the analysis of project cost budget data and proposes a two-stage strategy iterative algorithm to obtain the iterative control law and iterative performance index function. Moreover, this paper constructs an executive evaluation neural network to approximate the iterative control law and iterative performance index function, respectively. This neural network structure can implement the proposed algorithm online without the need for system dynamics. Through numerical simulation research and evaluation test research, it can be seen that the dynamic distributed clustering algorithm proposed in this paper has a good effect on the construction cost budget control system, which can effectively improve the reliability of construction project cost budget control.
ISSN:1687-5680
1687-5699
DOI:10.1155/2022/2970872