Wind resource assessment and wind power potential of Mil-E Nader region in Sistan and Baluchestan Province, Iran – Part 1: Annual energy estimation

•An estimation of wind power potential of Mil-E Nader region is proposed.•Wind data analyzed by well known wind energy software.•There is significant wind power potential at the region. In this paper, wind power potential of Mil-E Nader region is statistically analyzed based on 10min measured short...

Full description

Saved in:
Bibliographic Details
Published in:Energy conversion and management Vol. 79; pp. 273 - 280
Main Authors: Tizpar, A., Satkin, M., Roshan, M.B., Armoudli, Y.
Format: Journal Article
Language:English
Published: Kidlington Elsevier Ltd 01-03-2014
Elsevier
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:•An estimation of wind power potential of Mil-E Nader region is proposed.•Wind data analyzed by well known wind energy software.•There is significant wind power potential at the region. In this paper, wind power potential of Mil-E Nader region is statistically analyzed based on 10min measured short term wind data. Weibull parameters at 40m height have been estimated and used to describe the distribution of wind data and its frequencies. Additionally, diurnal and monthly wind speed variations have been calculated. Based on power law model and average wind speed at three heights (10, 30 and 40m), wind speeds at higher elevations have been extrapolated. Energy analysis has been carried out to find best hub height by comparing energy production of several wind turbines with different classes and hub heights. The energy production analysis showed that the wind turbines with 80m height have high production in comparison to the others.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 23
ISSN:0196-8904
1879-2227
DOI:10.1016/j.enconman.2013.10.004