First on-line results for As and F beams from HRIBF target/ion sources

The first on-line tests of the ion sources to provide radioactive ion beams of 69,70As and 17,18F for the Holifield Radioactive Ion Beam Facility have been performed using the UNISOR facility at HRIBF. For 70As the measured efficiency is 0.8 ± 0.3% with a hold-up time of 3.6 ± 0.3 h as measured with...

Full description

Saved in:
Bibliographic Details
Published in:Nuclear instruments & methods in physics research. Section B, Beam interactions with materials and atoms Vol. 126; no. 1; pp. 166 - 169
Main Authors: Carter, H.K., Kormicki, J., Stracener, D.W., Breitenbach, J.B., Blackmon, J.C., Smith, M.S., Bardayan, D.W.
Format: Journal Article
Language:English
Published: Elsevier B.V 01-04-1997
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The first on-line tests of the ion sources to provide radioactive ion beams of 69,70As and 17,18F for the Holifield Radioactive Ion Beam Facility have been performed using the UNISOR facility at HRIBF. For 70As the measured efficiency is 0.8 ± 0.3% with a hold-up time of 3.6 ± 0.3 h as measured with 72As at a target temperature of 1270°C. For 17F the efficiency for Al 17F is 0.0024 ± 0.0008% with a hold-up time of 16.4 ± 0.8 m as measured with Al 18F at a target temperature of 1470°C.
ISSN:0168-583X
1872-9584
DOI:10.1016/S0168-583X(96)01087-7