Multistage Expansion Planning of Integrated Biogas and Electric Power Delivery System Considering the Regional Availability of Biomass

Centralized biogas plant (CBP) provides an attractive solution to the energy supply for district heating, electric loads, and residential cooking in remote areas via a local biogas delivery network. To overcome the challenges of biomass availability for CBPs, an integrated expansion planning model i...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on sustainable energy Vol. 12; no. 2; pp. 920 - 930
Main Authors: Yang, Hanyu, Li, Canbing, Shahidehpour, Mohammad, Zhang, Cong, Zhou, Bin, Wu, Qiuwei, Zhou, Long
Format: Journal Article
Language:English
Published: Piscataway IEEE 01-04-2021
The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Centralized biogas plant (CBP) provides an attractive solution to the energy supply for district heating, electric loads, and residential cooking in remote areas via a local biogas delivery network. To overcome the challenges of biomass availability for CBPs, an integrated expansion planning model is proposed in this paper. The model makes investment decisions on the sequential planning of integrated electric power distribution and biogas delivery networks and uses the constrained biomass transportation network to optimally determine CBP locations in the integrated network. The proposed approach also considers the biomass availability and the cost of biomass supply in the integrated model. The proposed multistage stochastic planning problem makes investment decisions considering the gradual realization of uncertainties as loads grow and biomass is made available. The polyhedral approximation method is applied to convert the proposed mixed-integer second-order cone programming (MISOCP) problem to a mixed-integer linear programming (MILP) problem for making the problem more tractable for large-scale cases. The effectiveness of the proposed integrated model is validated using an 8-node and a 24-node test system.