Power System Restoration - The Second Task Force Report
In its second report, the Power System Restoration Task Force (PSR-TF) (1) reviews the 1979-83 North American Electric Reliability Council (NERC) Reports on Major Bulk Power System Disturbances (2), identifying restoration problems which have been encountered during that 5-year period. Generally, th...
Saved in:
Published in: | IEEE transactions on power systems Vol. 2; no. 4; pp. 927 - 932 |
---|---|
Main Authors: | , , |
Format: | Journal Article Conference Proceeding |
Language: | English |
Published: |
New York, NY
IEEE
01-11-1987
Institute of Electrical and Electronics Engineers |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In its second report, the Power System Restoration Task Force (PSR-TF) (1) reviews the 1979-83 North American Electric Reliability Council (NERC) Reports on Major Bulk Power System Disturbances (2), identifying restoration problems which have been encountered during that 5-year period. Generally, these problems fall into three phases of restoration activities: planning for restart, reintegration and restoration of the bulk power supply; control actions during system degradation for saving and retaining critical sources of power; and restoration after a major disturbance when the power system has stabilized. The report also briefly discusses the applicability of several existing programs to the system restoration process. The opinions and conclusions expressed in this paper are those of the authors; they are based on the referenced reports and have not been reviewed with NERC or the reporting utilities. |
---|---|
ISSN: | 0885-8950 1558-0679 |
DOI: | 10.1109/TPWRS.1987.4335278 |