MRP-based negotiation in collaborative supply chains
Although collaboration between parteners is now considered as a mean to increase the performance of the supply chains, most of them are still managed in a directive way through cascades of classical MRP/MRP2 systems, in which the constraints of the suppliers, especially the smallest ones, are poorly...
Saved in:
Published in: | International journal of production management and engineering Vol. 1; no. 1; pp. 27 - 37 |
---|---|
Main Authors: | , , |
Format: | Journal Article |
Language: | English |
Published: |
Universitat Politecnica de Valencia
01-07-2013
|
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Although collaboration between parteners is now considered as a mean to increase the performance of the supply chains, most of them are still managed in a directive way through cascades of classical MRP/MRP2 systems, in which the constraints of the suppliers, especially the smallest ones, are poorly taken into account. We suggest in this article to assess the interest of the integration into collaborative processes of some practices based on MRP, identified after a study in aeronautical supply chains. Within these processes, classical parameters of MRP would be negotiated instead of being imposed by the large companies. |
---|---|
ISSN: | 2340-4876 2340-4876 |
DOI: | 10.4995/ijpme.2013.1516 |