Development of a Collaborative Scheduling System of Offshore Platform Project Based on Multiagent Technology

Aimed at enhancing the effectiveness and efficiency for offshore platform project scheduling, a multiagent collaborative scheduling model based on the analysis of distributed offshore platform project scheduling was proposed. The functional definitions and internal structure of agents in the propose...

Full description

Saved in:
Bibliographic Details
Published in:Advances in Mechanical Engineering Vol. 6; p. 298149
Main Authors: Li, Jinghua, Li, Lingyao, Yang, Boxin, Zhou, Qinghua
Format: Journal Article
Language:English
Published: London, England SAGE Publications 01-01-2014
Sage Publications Ltd
SAGE Publishing
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Aimed at enhancing the effectiveness and efficiency for offshore platform project scheduling, a multiagent collaborative scheduling model based on the analysis of distributed offshore platform project scheduling was proposed. The functional definitions and internal structure of agents in the proposed system were analyzed. Moreover, in order to explore the cooperative way of agents, communication mechanism was presented and a negotiation model was elaborated. Then, system architecture and hardware architecture were constructed to lay a foundation to develop the collaborative scheduling system. Finally, an intelligent algorithm based on Bayesian method was designed to verify the negotiation model and a prototype system was developed to test the feasibility and rationality.
ISSN:1687-8132
1687-8140
1687-8140
1687-8132
DOI:10.1155/2014/298149