Design and First Tests of Five 100 GW Fast LTD Cavities into an E-Beam Diode Load

Summary form only given. A module consisting of five 100 GW Fast LTD cavities stacked in series was tested with e-beam diode load to study how a number of cavities behave and add their energy, power and voltage output in a voltage adder configuration assembly. In this report we present the design of...

Full description

Saved in:
Bibliographic Details
Published in:2007 IEEE 34th International Conference on Plasma Science (ICOPS) p. 200
Main Authors: Kim, Alexander A., Sinebryukhov, Vadim A., Kovalchuk, Boris M., Bastrikov, Alexander N., Durakov, Vjacheslav G., Volkov, Sergey N., Frolov, Sergey V., Alexeenko, Vitaly M., Mazarakis, Michael G., McDaniel, Dillon H., Olson, Craig L., Struve, Kenneth W., Gilgenbach, Ronald M.
Format: Conference Proceeding
Language:English
Published: IEEE 01-06-2007
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Summary form only given. A module consisting of five 100 GW Fast LTD cavities stacked in series was tested with e-beam diode load to study how a number of cavities behave and add their energy, power and voltage output in a voltage adder configuration assembly. In this report we present the design of the module and diode, and compare test results with simulations.
ISBN:9781424409150
1424409152
ISSN:0730-9244
2576-7208
DOI:10.1109/PPPS.2007.4345506