Design and First Tests of Five 100 GW Fast LTD Cavities into an E-Beam Diode Load
Summary form only given. A module consisting of five 100 GW Fast LTD cavities stacked in series was tested with e-beam diode load to study how a number of cavities behave and add their energy, power and voltage output in a voltage adder configuration assembly. In this report we present the design of...
Saved in:
Published in: | 2007 IEEE 34th International Conference on Plasma Science (ICOPS) p. 200 |
---|---|
Main Authors: | , , , , , , , , , , , , |
Format: | Conference Proceeding |
Language: | English |
Published: |
IEEE
01-06-2007
|
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Summary form only given. A module consisting of five 100 GW Fast LTD cavities stacked in series was tested with e-beam diode load to study how a number of cavities behave and add their energy, power and voltage output in a voltage adder configuration assembly. In this report we present the design of the module and diode, and compare test results with simulations. |
---|---|
ISBN: | 9781424409150 1424409152 |
ISSN: | 0730-9244 2576-7208 |
DOI: | 10.1109/PPPS.2007.4345506 |