The experiences with the application of the first electricity prepayment system in Brazil installed at an isolated community in the Amazon Region

This work consists of the exhibition of the acquired experiences with the application of the first electricity prepayment system in Brazil installed in an isolated community (Sao Tome village), located in the Amazon Region, being supplied by electric power through a hybrid PV-wind-diesel system gene...

Full description

Saved in:
Bibliographic Details
Published in:2004 IEEE/PES Transmision and Distribution Conference and Exposition: Latin America (IEEE Cat. No. 04EX956) pp. 663 - 668
Main Authors: Barbosa, C.F.O., Pinho, J.T., Galhardo, M.A.B., Cruz, D.P., Araujo, R.G.
Format: Conference Proceeding
Language:English
Published: IEEE 2004
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This work consists of the exhibition of the acquired experiences with the application of the first electricity prepayment system in Brazil installed in an isolated community (Sao Tome village), located in the Amazon Region, being supplied by electric power through a hybrid PV-wind-diesel system generation. In this way the characterization of the communities is presented (location, socioeconomic profile and load data), the description of the hybrid system and in details the prepayment system. Besides, it is numbered as the benefits (advantages) as the proportioned disadvantages to the components of the electric system of the village with the use of this last one and the acceptance degree of the local population.
ISBN:9780780387751
0780387759
DOI:10.1109/TDC.2004.1432458