Assessment of primary and secondary bleed and feed procedures during a Station Blackout in a German Konvoi PWR using ASTECV2.0
•Efficiency of SAM during SBO in Konvoi PWR is assessed using ASTECV2.0.•Secondary bleed/feed must be launched before CET > 400 °C and with 10 kg/s.•Primary bleed/feed must be launched with a maximum delay of 30 min after CET > 400 °C.•Major core damage prevented if reflooding started at CET =...