Symbiotic readiness: Factors that interfere with the industrial symbiosis implementation
In a context of raw material scarcity and environmental concerns, the Industrial Symbiosis (IS) emerges as a strategy that collaborates to increase the resources circularity and sustainability. Despite its relevance, companies still have difficulties to assess whether they have conditions to impleme...
Saved in:
Published in: | Journal of cleaner production Vol. 387; p. 135843 |
---|---|
Main Authors: | , , |
Format: | Journal Article |
Language: | English |
Published: |
Elsevier Ltd
10-02-2023
|
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In a context of raw material scarcity and environmental concerns, the Industrial Symbiosis (IS) emerges as a strategy that collaborates to increase the resources circularity and sustainability. Despite its relevance, companies still have difficulties to assess whether they have conditions to implement IS. Therefore, the aim of this paper is to identify factors that interfere with the readiness of co-located companies to implement IS. To achieve this objective, theoretical, empirical and statistical research procedures were employed. As a theoretical procedure, a Symbiotic Readiness Assessment Instrument (SRAI), previously developed, was adapted. For the empirical procedure, a survey with 201 co-located companies in industrial parks was applied using the SRAI adapted. For the statistical procedure, a factor analysis was carried out to obtain the main factors that interfere with the IS implementation. As a result, five factors were identified. In view of this, to assess symbiotic readiness, companies must analyze: the availability of water and energy resources; the possibility of exchanging material resources such as waste and by-products; the accessibility of data, such as production information from others companies; the possibility of sharing information and bonds of trust between co-located industries; and access conditions, infrastructure and partnership for the symbiosis realization.
•Companies have difficulties to assess whether are able to implement symbiosis.•Symbiotic readiness is an incipient topic. Survey with co-located firms was applied.•Five factors to assess symbiotic readiness were identified.•Exchange resources and exchange capacity are indicated to assess symbiotic readiness. |
---|---|
ISSN: | 0959-6526 1879-1786 |
DOI: | 10.1016/j.jclepro.2023.135843 |