Project as a System and its Management
The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control sys...
Saved in:
Published in: | Acta Informatica Pragensia Vol. 6; no. 1; pp. 4 - 19 |
---|---|
Main Authors: | , , , |
Format: | Journal Article |
Language: | English |
Published: |
Prague University of Economics and Business
30-06-2017
|
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Abstract | The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool. |
---|---|
AbstractList | The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool. |
Author | Skalický, Jiří Januška, Martin Čech, Marek Vacek, Jiří |
Author_xml | – sequence: 1 givenname: Jiří surname: Skalický fullname: Skalický, Jiří – sequence: 2 givenname: Jiří surname: Vacek fullname: Vacek, Jiří – sequence: 3 givenname: Marek surname: Čech fullname: Čech, Marek – sequence: 4 givenname: Martin surname: Januška fullname: Januška, Martin |
BookMark | eNpN0EtLw0AUBeBBKlhrF_6DrAQXqXfeM0spPgoVBXU93MxMSkKTlJls-u8NrYirczlwv8W5JrN-6CMhtxRW1DClH9oVNoeVVRdkTg3IUlhJZ__uK7LMuQUAyqRUUs7J3Uca2ujHAnOBxecxj7ErsA9FM-biDXvcxS724w25rHGf4_I3F-T7-elr_Vpu318268dt6SlAXcYqUMG08MACYx6CETxYVSnBkBnpK-nBUsO1VMYKiwqQ-hoDeK0M5xVfkM3ZDQO27pCaDtPRDdi4UzGkncM0Nn4fHWWmRiamf8PF5FbeRNAV1UwrK3k9Wfdny6ch5xTrP4-CO-3lWjft5aziPwEuXJU |
Cites_doi | 10.1016/j.ijpe.2016.08.011 10.1016/j.ijpe.2010.11.023 10.1016/j.ijproman.2017.01.010 10.1016/j.ijpe.2015.09.007 10.1016/j.technovation.2013.12.005 10.1287/mnsc.1070.0787 |
ContentType | Journal Article |
DBID | AAYXX CITATION DOA |
DOI | 10.18267/j.aip.96 |
DatabaseName | CrossRef Directory of Open Access Journals |
DatabaseTitle | CrossRef |
DatabaseTitleList | |
Database_xml | – sequence: 1 dbid: DOA name: Directory of Open Access Journals url: http://www.doaj.org/ sourceTypes: Open Website |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Computer Science |
EISSN | 1805-4951 |
EndPage | 19 |
ExternalDocumentID | oai_doaj_org_article_128fa241cf8345c0bc8e07b17276953f 10_18267_j_aip_96 |
GroupedDBID | 5VS AAYXX ADBBV ALMA_UNASSIGNED_HOLDINGS BCNDV CITATION GROUPED_DOAJ KQ8 M~E OK1 REL |
ID | FETCH-LOGICAL-c100f-ebd14274c02d22c0d843d96b642a285cb5c091837568949a60a1cfad0c76833b3 |
IEDL.DBID | DOA |
ISSN | 1805-4951 |
IngestDate | Tue Oct 22 15:14:30 EDT 2024 Wed Jul 24 12:30:23 EDT 2024 |
IsDoiOpenAccess | true |
IsOpenAccess | true |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 1 |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c100f-ebd14274c02d22c0d843d96b642a285cb5c091837568949a60a1cfad0c76833b3 |
OpenAccessLink | https://doaj.org/article/128fa241cf8345c0bc8e07b17276953f |
PageCount | 16 |
ParticipantIDs | doaj_primary_oai_doaj_org_article_128fa241cf8345c0bc8e07b17276953f crossref_primary_10_18267_j_aip_96 |
PublicationCentury | 2000 |
PublicationDate | 2017-6-30 |
PublicationDateYYYYMMDD | 2017-06-30 |
PublicationDate_xml | – month: 06 year: 2017 text: 2017-6-30 day: 30 |
PublicationDecade | 2010 |
PublicationTitle | Acta Informatica Pragensia |
PublicationYear | 2017 |
Publisher | Prague University of Economics and Business |
Publisher_xml | – name: Prague University of Economics and Business |
References | ref24 PMI (ref23) 2013 ref20 ref22 Skalický (ref25) 2016 Bodea (ref0) 2012; 7 Dolez (ref4) 2016 ISO (ref13) 2009 ISO (ref14) 2012 Mildeová (ref16) 2008 ref17 Deparment (ref2) 2017 ref19 Dunbar (ref5) 2016 ref6 ISO (ref15) 2015 NASA (ref18) 2015; 4 Sterman (ref27) 2000 Fleming (ref7) 2010 |
References_xml | – ident: ref6 doi: 10.1016/j.ijpe.2016.08.011 – volume-title: ISO 21500:2012 Guidance on project management year: 2012 ident: ref14 contributor: fullname: ISO – volume-title: A Guide to the Project Management Body of Knowledge: (PMBOK® Guide). 5th ed year: 2013 ident: ref23 contributor: fullname: PMI – volume-title: Aktuální rizika a možnosti jejich uchopení systémovým inženýrstvím year: 2016 ident: ref25 article-title: Řízení systému projekt a metoda řízení dosažené hodnoty (EVM contributor: fullname: Skalický – volume: 7 start-page: 565 issue: 4 year: 2012 ident: ref0 article-title: & Purnuş, A. (2012). Project Risk Simulation Methods - a Comparative Analysis. Management & Marketing Challenges for the publication-title: Knowledge Society contributor: fullname: Bodea – ident: ref19 doi: 10.1016/j.ijpe.2010.11.023 – volume-title: Department of Defense Risk, Issue, and Opportunity Management Guide for Defense Acquisition Programs. Deparment of Defense year: 2017 ident: ref2 contributor: fullname: Deparment – volume-title: Earned Value Project Management. 4th Edition year: 2010 ident: ref7 contributor: fullname: Fleming – volume-title: Project Management Failures - Standish (Chaos) reports (1994-2015 year: 2016 ident: ref5 contributor: fullname: Dunbar – volume-title: Systémová dynamika year: 2008 ident: ref16 contributor: fullname: Mildeová – volume-title: ISO 31000:2009 Risk management - Principles and guidelines year: 2009 ident: ref13 contributor: fullname: ISO – ident: ref17 doi: 10.1016/j.ijproman.2017.01.010 – ident: ref22 doi: 10.1016/j.ijpe.2015.09.007 – volume: 4 start-page: 4 year: 2015 ident: ref18 article-title: NASA publication-title: Cost Estimating Handbook Version contributor: fullname: NASA – volume-title: Business Dynamics: Systems Thinking and Modeling for a Complex World with CD-ROM year: 2000 ident: ref27 contributor: fullname: Sterman – volume-title: ISO 21504:2015 Project, programme and portfolio management year: 2015 ident: ref15 contributor: fullname: ISO – volume-title: Projektový management: komplexně, prakticky a podle světových standardů year: 2016 ident: ref4 contributor: fullname: Dolez – ident: ref20 doi: 10.1016/j.technovation.2013.12.005 – ident: ref24 doi: 10.1287/mnsc.1070.0787 |
SSID | ssj0001255655 |
Score | 2.0459657 |
Snippet | The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common... |
SourceID | doaj crossref |
SourceType | Open Website Aggregation Database |
StartPage | 4 |
SubjectTerms | Project management Project risks System System dynamics |
Title | Project as a System and its Management |
URI | https://doaj.org/article/128fa241cf8345c0bc8e07b17276953f |
Volume | 6 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://sdu.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV07T8MwED4BEwtvRHnJQojNrWM7jj3yaNUJIQESW-RXpDKUirb_n3Oclm4srFFixXeyv-87nb4DuOXKI2hwR70TlkpnHHWGRyrSPJHG6ch8Kg2MX6vnD_00TDY561FfqScs2wPnwA3w_mwswoxvtJClZ87j95VLuKtMKZr29mVqQ0zl6kqJTKXsrISQQleDz76dzPrJnH8DgDZ8-ltAGR3AXscEyX3-g0PYitMj2F9NWSDdoTuGu5dcLCF2TizJDuME9T-ZLObkt3vlBN5Hw7fHMe2mG1BfMNbQ6EIhURN6xgPnngUtRTDKoSCwXJfe4WYNHriqVNpIYxWzGAQbmEeFIIQTp7Az_ZrGMyDBVF6iFLFVEWXBo0POF4WttLKcO-17cLPacj3LJhZ1Iv8pLsj-MS61UT14SMFYv5B8p9sHmI26y0b9VzbO_2ORC9jlCTzbrrxL2Fl8L-MVbM_D8rrN8g8CU6nu |
link.rule.ids | 315,782,786,866,2106,27933,27934 |
linkProvider | Directory of Open Access Journals |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Project+as+a+System+and+its+Management&rft.jtitle=Acta+Informatica+Pragensia&rft.au=Ji%C5%99%C3%AD+Skalick%C3%BD&rft.au=Ji%C5%99%C3%AD+Vacek&rft.au=Marek+%C4%8Cech&rft.au=Martin+Janu%C5%A1ka&rft.date=2017-06-30&rft.pub=Prague+University+of+Economics+and+Business&rft.eissn=1805-4951&rft.volume=6&rft.issue=1&rft.spage=4&rft.epage=19&rft_id=info:doi/10.18267%2Fj.aip.96&rft.externalDBID=DOA&rft.externalDocID=oai_doaj_org_article_128fa241cf8345c0bc8e07b17276953f |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1805-4951&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1805-4951&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1805-4951&client=summon |