A Cause and Effect of a Nonpayment Model Based on the DEMATEL Algorithm
AbstractPayment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has only looked at the cause and effect of payment problems in the construction industry, not the link between the variables. The purpose of...
Saved in:
Published in: | Journal of legal affairs and dispute resolution in engineering and construction Vol. 15; no. 1 |
---|---|
Main Authors: | , , , |
Format: | Journal Article |
Language: | English |
Published: |
Reston
American Society of Civil Engineers
01-02-2023
|
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Abstract | AbstractPayment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has only looked at the cause and effect of payment problems in the construction industry, not the link between the variables. The purpose of this study is to look at the causes and repercussions of nonpayment, as well as their interactions. The study’s list of causes and consequences was compiled from a literature review, and nine were retrieved. The Decision-Making Trial and Evaluation Laboratory (DEMATEL) technique was used to create a causal relationship between the causes and effects of nonpayment so they may be understood and intervened in. Paymaster’s inadequate financial management (C1), local culture and attitude (C2), document error (C6), contractual provision (C8), and disagreement on the valuation of work done (C9) are the major cause factors, according to the data collected from 13 respondents. The key repercussions, on the other hand, include cash flow problem (E2), bankruptcy and liquidation (E4), project abandonment (E5), delay (E7), and disputes (E8). The conclusions of this study can assist major players in the construction sector, as well as the government, in establishing a strategy to effectively address the nonpayment problem in the industry. |
---|---|
AbstractList | Payment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has only looked at the cause and effect of payment problems in the construction industry, not the link between the variables. The purpose of this study is to look at the causes and repercussions of nonpayment, as well as their interactions. The study’s list of causes and consequences was compiled from a literature review, and nine were retrieved. The Decision-Making Trial and Evaluation Laboratory (DEMATEL) technique was used to create a causal relationship between the causes and effects of nonpayment so they may be understood and intervened in. Paymaster’s inadequate financial management (C1), local culture and attitude (C2), document error (C6), contractual provision (C8), and disagreement on the valuation of work done (C9) are the major cause factors, according to the data collected from 13 respondents. The key repercussions, on the other hand, include cash flow problem (E2), bankruptcy and liquidation (E4), project abandonment (E5), delay (E7), and disputes (E8). The conclusions of this study can assist major players in the construction sector, as well as the government, in establishing a strategy to effectively address the nonpayment problem in the industry. AbstractPayment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has only looked at the cause and effect of payment problems in the construction industry, not the link between the variables. The purpose of this study is to look at the causes and repercussions of nonpayment, as well as their interactions. The study’s list of causes and consequences was compiled from a literature review, and nine were retrieved. The Decision-Making Trial and Evaluation Laboratory (DEMATEL) technique was used to create a causal relationship between the causes and effects of nonpayment so they may be understood and intervened in. Paymaster’s inadequate financial management (C1), local culture and attitude (C2), document error (C6), contractual provision (C8), and disagreement on the valuation of work done (C9) are the major cause factors, according to the data collected from 13 respondents. The key repercussions, on the other hand, include cash flow problem (E2), bankruptcy and liquidation (E4), project abandonment (E5), delay (E7), and disputes (E8). The conclusions of this study can assist major players in the construction sector, as well as the government, in establishing a strategy to effectively address the nonpayment problem in the industry. |
Author | Lee, Chia Kuang Abd Jamil, Ahmad Huzaimi Bujna, Marián Ee, Pei Theng |
Author_xml | – sequence: 1 givenname: Chia Kuang surname: Lee fullname: Lee, Chia Kuang organization: Universiti Malaysia Pahang Senior Lecturer, Faculty of Industrial Management, , Lebuhraya Tun Razak, 26300 Gambang, Pahang, (corresponding author). ORCID: . Email – sequence: 2 givenname: Marián surname: Bujna fullname: Bujna, Marián email: marian.bujna@uniag.sk organization: Slovak Univ. of Agricultural Associate Professor, Faculty of Engineering, , Tr. A. Hlinku 2, 949 76 Nitra, . ORCID: . Email – sequence: 3 givenname: Ahmad Huzaimi surname: Abd Jamil fullname: Abd Jamil, Ahmad Huzaimi organization: Universiti Malaysia Pahang Senior Lecturer, Faculty of Industrial Management, , Lebuhraya Tun Razak, 26300 Gambang, Pahang, . ORCID: . Email – sequence: 4 givenname: Pei Theng surname: Ee fullname: Ee, Pei Theng email: peithengee@gmail.com organization: Universiti Malaysia Pahang Project Student, Faculty of Industrial Management, , Lebuhraya Tun Razak, 26300 Gambang, Pahang, . Email |
BookMark | eNp1kM1OwzAQhC1UJNrCO1hwgUOK_x1zMyEUpBQOlLNlJTZt1cYlTg99exK1lBN72dVoZlb6RmBQh9oBcI3RBCOB72_1R5bfFXqCFaMJwxJNUDdckTMwPGmD0y3IBRjFuEJIcEHZEEw1zOwuOmjrCubeu7KFwUML30K9tfuNq1s4C5Vbw0cbXQVDDduFg0_5TM_zAur1V2iW7WJzCc69XUd3ddxj8Pmcz7OXpHifvma6SCwRsk04EUgSRbFQkqRWUuSYRFx4hQWvBGe0VwTi2KlSKYaUoCnDqXTYVySldAxuDr3bJnzvXGzNKuyauntpiKRMMSKV6lwPB1fZhBgb5822WW5sszcYmR6cMT04U2jTgzE9JHME14XFIWxj6f7qf5P_B38AxFtuOw |
CitedBy_id | crossref_primary_10_1061_JLADAH_LADR_1118 |
Cites_doi | 10.1061/(ASCE)ME.1943-5479.0000319 10.1504/IJMDM.2006.009140 10.1108/13664380580001074 10.1016/j.knosys.2010.01.013 10.1111/1467-8551.00375 10.5130/ajceb.v10i1/2.1592 10.1061/(ASCE)0733-9364(2005)131:8(866) 10.1016/j.eswa.2005.12.005 10.1016/S0263-7863(02)00055-8 10.1016/j.eswa.2006.02.004 10.1080/03610918.2012.735322 10.1017/CBO9780511756245 10.19026/rjaset.5.4475 10.1016/j.ijproman.2006.11.007 10.1016/j.jairtraman.2007.04.008 10.1016/j.ijproman.2011.04.002 10.18517/ijaseit.1.6.125 10.1016/j.eswa.2008.11.040 10.1680/daiitci.28388 10.1057/rlp.2009.11 10.11113/jt.v70.2804 10.22452/jscp.vol1no1.4 10.1016/j.proeng.2011.11.192 |
ContentType | Journal Article |
Copyright | 2022 American Society of Civil Engineers |
Copyright_xml | – notice: 2022 American Society of Civil Engineers |
DBID | AAYXX CITATION 7TA 7TB 8FD FR3 JG9 KR7 |
DOI | 10.1061/(ASCE)LA.1943-4170.0000592 |
DatabaseName | CrossRef Materials Business File Mechanical & Transportation Engineering Abstracts Technology Research Database Engineering Research Database Materials Research Database Civil Engineering Abstracts |
DatabaseTitle | CrossRef Materials Research Database Civil Engineering Abstracts Engineering Research Database Technology Research Database Mechanical & Transportation Engineering Abstracts Materials Business File |
DatabaseTitleList | Materials Research Database |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Law |
EISSN | 1943-4170 |
ExternalDocumentID | 10_1061__ASCE_LA_1943_4170_0000592 10_1061_ASCE_LA_1943_4170_0000592 |
GroupedDBID | -0O 0R~ 29K 4.4 AAIKC AAMNW ABBOT ACIWK ACNET ADNWM ADVLX ADZKS AHHRU ALMA_UNASSIGNED_HOLDINGS ARKUK D-I E70 EBS GQVBS HZ~ L7B O9- RAC UCJ AAYOK AAYXX ABTAH ALNAR CITATION EJD ZY4 7TA 7TB 8FD FR3 JG9 KR7 |
ID | FETCH-LOGICAL-a267t-52607293169728a730e47056f9165d654330e46051e9c994096384187e1fd2833 |
IEDL.DBID | RAC |
ISSN | 1943-4162 |
IngestDate | Thu Oct 10 16:05:55 EDT 2024 Fri Aug 23 01:47:49 EDT 2024 Sat Nov 12 04:24:35 EST 2022 |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 1 |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-a267t-52607293169728a730e47056f9165d654330e46051e9c994096384187e1fd2833 |
ORCID | 0000-0003-4281-5649 0000-0002-1782-3180 0000-0001-6063-8071 |
PQID | 2734942799 |
PQPubID | 2046328 |
ParticipantIDs | proquest_journals_2734942799 crossref_primary_10_1061__ASCE_LA_1943_4170_0000592 asce_journals_10_1061_ASCE_LA_1943_4170_0000592 |
PublicationCentury | 2000 |
PublicationDate | 2023-2-1 2023-02-00 20230201 |
PublicationDateYYYYMMDD | 2023-02-01 |
PublicationDate_xml | – month: 02 year: 2023 text: 2023-2-1 day: 01 |
PublicationDecade | 2020 |
PublicationPlace | Reston |
PublicationPlace_xml | – name: Reston |
PublicationTitle | Journal of legal affairs and dispute resolution in engineering and construction |
PublicationYear | 2023 |
Publisher | American Society of Civil Engineers |
Publisher_xml | – name: American Society of Civil Engineers |
References | Azman M. N. A. (e_1_3_3_2_7_1) 2013 Mohammed K. A. (e_1_3_3_2_33_1) 2012; 4 e_1_3_3_2_11_1 e_1_3_3_2_30_1 e_1_3_3_2_10_1 e_1_3_3_2_31_1 Wuni I. Y. (e_1_3_3_2_46_1) 2017; 5 Cotter P. (e_1_3_3_2_12_1) 2005 e_1_3_3_2_29_1 Ezekiel S. A. (e_1_3_3_2_14_1) 2009 e_1_3_3_2_27_1 Yang Y.-P. O. (e_1_3_3_2_47_1) 2008; 5 e_1_3_3_2_26_1 Lip E. (e_1_3_3_2_28_1) 2003; 3 Ye K. M. (e_1_3_3_2_48_1) 2010; 4 Abdul-Rahman H. (e_1_3_3_2_2_1) 2013; 1 e_1_3_3_2_23_1 e_1_3_3_2_24_1 e_1_3_3_2_45_1 Munaaim M. C. (e_1_3_3_2_34_1) 2007; 3 Yu R. (e_1_3_3_2_49_1) 2006; 180 Lim C. F. (e_1_3_3_2_25_1) 2005 e_1_3_3_2_8_1 Halim M. (e_1_3_3_2_18_1) 2010; 52 e_1_3_3_2_3_1 e_1_3_3_2_6_1 e_1_3_3_2_5_1 Reeves K. (e_1_3_3_2_38_1) 2003; 1 e_1_3_3_2_21_1 e_1_3_3_2_44_1 Ansah S. K. (e_1_3_3_2_4_1) 2011; 1 e_1_3_3_2_22_1 e_1_3_3_2_43_1 Haseeb M. (e_1_3_3_2_20_1) 2011; 1 e_1_3_3_2_42_1 e_1_3_3_2_41_1 e_1_3_3_2_40_1 e_1_3_3_2_17_1 Mohamad M. (e_1_3_3_2_32_1) 2012; 4 e_1_3_3_2_16_1 Badroldin M. K. A. M. (e_1_3_3_2_9_1) 2016; 28 e_1_3_3_2_19_1 e_1_3_3_2_39_1 e_1_3_3_2_13_1 e_1_3_3_2_36_1 e_1_3_3_2_15_1 e_1_3_3_2_35_1 Ramus J. (e_1_3_3_2_37_1) 2006 |
References_xml | – ident: e_1_3_3_2_29_1 doi: 10.1061/(ASCE)ME.1943-5479.0000319 – volume: 3 start-page: 35 issue: 1 year: 2007 ident: e_1_3_3_2_34_1 article-title: Is late or non-payment a significant problem to Malaysian contractors publication-title: J. Des. Built Environ. contributor: fullname: Munaaim M. C. – volume: 3 start-page: 1 issue: 41 year: 2003 ident: e_1_3_3_2_28_1 article-title: Construction payment blues–Why that domino effect publication-title: Davis Langdon Seah Consult. Execut. Summaries Pract. contributor: fullname: Lip E. – ident: e_1_3_3_2_11_1 doi: 10.1504/IJMDM.2006.009140 – volume: 4 start-page: 120 issue: 2 year: 2012 ident: e_1_3_3_2_33_1 article-title: Causes of delay in Nigeria construction industry publication-title: Interdiscip. J. Contemp. Res. Bus. contributor: fullname: Mohammed K. A. – volume-title: Experian’s Business Information Division year: 2005 ident: e_1_3_3_2_12_1 contributor: fullname: Cotter P. – volume: 1 start-page: 41 issue: 5 year: 2011 ident: e_1_3_3_2_20_1 article-title: Problems of projects and effects of delays in the construction industry of Pakistan publication-title: Aust. J. Bus. Manage. Res. contributor: fullname: Haseeb M. – ident: e_1_3_3_2_35_1 doi: 10.1108/13664380580001074 – volume: 52 start-page: 28 issue: 20 year: 2010 ident: e_1_3_3_2_18_1 article-title: The contracting firm’s failure and financial related factors: A case study of Malaysian contracting firms publication-title: Int. Res. J. Finance Econ. contributor: fullname: Halim M. – volume-title: The Malaysia construction industry—The present dilemmas of the unpaid contractors year: 2005 ident: e_1_3_3_2_25_1 contributor: fullname: Lim C. F. – ident: e_1_3_3_2_40_1 doi: 10.1016/j.knosys.2010.01.013 – volume: 180 start-page: 63 issue: 1 year: 2006 ident: e_1_3_3_2_49_1 article-title: A soft computing method for multi-criteria decision making with dependence and feedback publication-title: Appl. Math. Comput. contributor: fullname: Yu R. – volume: 4 start-page: 503 issue: 5 year: 2010 ident: e_1_3_3_2_48_1 article-title: Risk of late payment in the Malaysian construction industry publication-title: Int. J. Mech. Ind. Eng. contributor: fullname: Ye K. M. – volume-title: Principles and practice of MAS communication year: 2009 ident: e_1_3_3_2_14_1 contributor: fullname: Ezekiel S. A. – volume: 4 start-page: 22 issue: 5 year: 2012 ident: e_1_3_3_2_32_1 article-title: The adequacy of contractual provisions in managing construction failure in Malaysia publication-title: Eur. J. Bus. Manage. contributor: fullname: Mohamad M. – ident: e_1_3_3_2_43_1 doi: 10.1111/1467-8551.00375 – volume: 28 start-page: 149 issue: 3 year: 2016 ident: e_1_3_3_2_9_1 article-title: Late payment practices in the Malaysian construction industry publication-title: Malaysian J. Civ. Eng. contributor: fullname: Badroldin M. K. A. M. – ident: e_1_3_3_2_17_1 doi: 10.5130/ajceb.v10i1/2.1592 – ident: e_1_3_3_2_42_1 – ident: e_1_3_3_2_5_1 doi: 10.1061/(ASCE)0733-9364(2005)131:8(866) – ident: e_1_3_3_2_45_1 doi: 10.1016/j.eswa.2005.12.005 – volume-title: Payment scenario in the Malaysian construction industry prior to CIPAA year: 2013 ident: e_1_3_3_2_7_1 contributor: fullname: Azman M. N. A. – ident: e_1_3_3_2_16_1 doi: 10.1016/S0263-7863(02)00055-8 – ident: e_1_3_3_2_44_1 doi: 10.1016/j.eswa.2006.02.004 – ident: e_1_3_3_2_41_1 doi: 10.1080/03610918.2012.735322 – volume: 5 start-page: 160 issue: 3 year: 2008 ident: e_1_3_3_2_47_1 article-title: A novel hybrid MCDM model combined with DEMATEL and ANP with applications publication-title: Int. J. Oper. Res. contributor: fullname: Yang Y.-P. O. – ident: e_1_3_3_2_10_1 doi: 10.1017/CBO9780511756245 – ident: e_1_3_3_2_15_1 doi: 10.19026/rjaset.5.4475 – ident: e_1_3_3_2_39_1 doi: 10.1016/j.ijproman.2006.11.007 – ident: e_1_3_3_2_27_1 doi: 10.1016/j.jairtraman.2007.04.008 – ident: e_1_3_3_2_13_1 – ident: e_1_3_3_2_31_1 doi: 10.1016/j.ijproman.2011.04.002 – ident: e_1_3_3_2_21_1 – volume: 1 start-page: 4 issue: 2003 year: 2003 ident: e_1_3_3_2_38_1 article-title: Pay up publication-title: JUBM Constr. News Views contributor: fullname: Reeves K. – ident: e_1_3_3_2_30_1 doi: 10.18517/ijaseit.1.6.125 – volume-title: Contract practice for surveyors year: 2006 ident: e_1_3_3_2_37_1 contributor: fullname: Ramus J. – ident: e_1_3_3_2_24_1 – volume: 1 start-page: 27 issue: 1 year: 2011 ident: e_1_3_3_2_4_1 article-title: Causes and effects of delayed payments by clients on construction projects in Ghana publication-title: J. Constr. Project Manage. Innov. contributor: fullname: Ansah S. K. – ident: e_1_3_3_2_26_1 doi: 10.1016/j.eswa.2008.11.040 – ident: e_1_3_3_2_22_1 doi: 10.1680/daiitci.28388 – ident: e_1_3_3_2_3_1 doi: 10.1057/rlp.2009.11 – ident: e_1_3_3_2_6_1 – ident: e_1_3_3_2_8_1 doi: 10.11113/jt.v70.2804 – ident: e_1_3_3_2_23_1 doi: 10.22452/jscp.vol1no1.4 – volume: 5 start-page: 12 issue: 7 year: 2017 ident: e_1_3_3_2_46_1 article-title: Critical causes and effects of payment delays in the execution of public construction projects in Ghana: Fresh evidence from the Brong-Ahafo region publication-title: Dev. Country Stud. contributor: fullname: Wuni I. Y. – ident: e_1_3_3_2_36_1 – ident: e_1_3_3_2_19_1 doi: 10.1016/j.proeng.2011.11.192 – volume: 1 start-page: 8 issue: 1 year: 2013 ident: e_1_3_3_2_2_1 article-title: Cause, effect and reaction for late-payment and non-payment issues in Malaysian building sector publication-title: Topclass J. Bus. Manage. Innov. contributor: fullname: Abdul-Rahman H. |
SSID | ssj0065634 |
Score | 2.2684383 |
Snippet | AbstractPayment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research... Payment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has... |
SourceID | proquest crossref asce |
SourceType | Aggregation Database Publisher |
SubjectTerms | Algorithms Bankruptcy Construction industry Decision making Financial management Literature reviews Scholarly Paper Scholarly Papers |
Title | A Cause and Effect of a Nonpayment Model Based on the DEMATEL Algorithm |
URI | http://ascelibrary.org/doi/abs/10.1061/(ASCE)LA.1943-4170.0000592 https://www.proquest.com/docview/2734942799 |
Volume | 15 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://sdu.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV07T8MwELZoWVh4IwoFeWCAIdC84zGElg5RB1oktugSOwWpJFXTCvHvucujqEslJNYodk53vrvvYvs7xm4AbMDACJpugadZjkw0SMHQYscgejhbipguJw_H7ujNe-oTTU5zmhCKRK25HhbTkl8A4qr5CGaeh1t_HPTvQv8ea29Ts3S3VxIQ2gKj8C5t-NMif_GDJhgjWqk3lsvXHaPhHd06F4ZnEmQzVW1G6jL9DA7-QfBDtl9jT-5Xi-WI7ajsmLVC-Dphzz4PYFUoDpnkFaMxz1MOfJRnc_imX4ic2qbN-COmPcnzjCNy5GhFf9IPuT-b5ouP5fvnKXsd9CfBUKt7LGhgOO4S61CHuMNN3RGu4QH6u7JcBEUpwkZb0sVTeoI1j65EIgRWg-iwlu65Sk8lQhPzjLWzPFPnjGOuTyRWvBJM1-qBjYDYE3SGNjXNJFZOh5VaimonKaJy_9vRI1JNFPoRqSYi1US1ajrMbAwQzSvyjfWgbaO6ja1-v0UsPsIyXCEu_izGJdujJvPVWe0uay8XK3XFWoVcXZeL7Qeo5MV5 |
link.rule.ids | 315,782,786,3256,10076,27933,27934,76201,76209 |
linkProvider | American Society of Civil Engineers |
linkToHtml | http://sdu.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV07T8MwELZoGWDhjSgU8MAAQ6B5x2MIKUWEDrRIbNY1dgpSSaqmFeLfc86jqAsSEmsUO9ad7-67-PwdIRcANqBjBE23wNMsR8QaJGBoI8dQ9HC2YCN1Obk3cPuv3l2oaHLqakLIY7nkepiNC34BGJXNRzDy3Fz6gyC8ivxrzL1NzdLdTkFAaDP0wuto1x1lm89-UDtjRCvVwXLxumPUvKO_zoXuWS1kNVSteuoi_HS3_2HhO2Srwp7ULzfLLlmT6R5pRPC5T-59GsAilxRSQUtGY5olFGg_S6fwpX4hUtU2bUJvMewJmqUUkSNFLfrDMKL-ZJzN3udvHwfkpRsOg55W9VjQwHDcOeahjuION3WHuYYHaO_SchEUJQgbbaEunqonmPPoksWMYTaIBmvpniv1RCA0MQ9JM81SeUQoxvpYYMYrwHStDtgIiD2mamgT04xH0mmRQkq8MpKcF-ffjs6VaHjkcyUarkTDK9G0iFkrgE9L8o3loN9GtWtd_XxLsfgwy3AZO_7zMs7JRm_4FPHoof94QjZVw_mybrtNmvPZQp6SRi4WZ8XG-wYRo8hl |
linkToPdf | http://sdu.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1LT8MwDI7YkBAX3ojBgBw4wKGwvtLmWPZgiGpCbEjcIq9JB9Jopz2E-Pc4fQztMgmJa9Wklh3bnxvnCyFXAC5gYATDdMA3HCYjA2KwjCGzND2cK_lQH07u9r3em99qa5qcspsQZpFacj1MRxm_wETGeZnJzLvroN9s34TBLdbetuGYXiMjIHQ5RuFN9OuGXtgvQbMMxohWio3l7HVmlbyja-fC8KwFWU1Vq5E6Sz-d3X8QfI_sFNiTBvli2ScbKjkglRC-DslDQJuwmCkKiaQ5ozFNYwq0lyYT-Na_EKm-Nm1M7zHtSZomFJEjRSsGg3ZIg_EonX7M3z-PyGunPWh2jeKOBQMs5s2xDmWaO9w2GfcsH9DfleMhKIoRNrpSHzzVT7DmMRWPOMdqEB3WMX1PmbFEaGIfk2qSJuqEUMz1kcSKV4LtOQ1wERD7XPfQxrYdDRWrkUxLonCSmcj2v5kptGpEGAitGqFVIwrV1IhdGkBMcvKN5aB1o-qlrX6_pVl8uGN5nJ_-WYxLsvXc6ojwsfd0Rrb1ffN523adVOfThTonlZlcXGTr7gdqTcgZ |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+Cause+and+Effect+of+a+Nonpayment+Model+Based+on+the+DEMATEL+Algorithm&rft.jtitle=Journal+of+legal+affairs+and+dispute+resolution+in+engineering+and+construction&rft.au=Chia+Kuang+Lee&rft.au=Bujna%2C+Mari%C3%A1n&rft.au=Ahmad+Huzaimi+Abd+Jamil&rft.au=Pei%2C+Theng+Ee&rft.date=2023-02-01&rft.pub=American+Society+of+Civil+Engineers&rft.issn=1943-4162&rft.eissn=1943-4170&rft.volume=15&rft.issue=1&rft_id=info:doi/10.1061%2F%28ASCE%29LA.1943-4170.0000592&rft.externalDBID=NO_FULL_TEXT |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1943-4162&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1943-4162&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1943-4162&client=summon |