A Cause and Effect of a Nonpayment Model Based on the DEMATEL Algorithm

AbstractPayment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has only looked at the cause and effect of payment problems in the construction industry, not the link between the variables. The purpose of...

Full description

Saved in:
Bibliographic Details
Published in:Journal of legal affairs and dispute resolution in engineering and construction Vol. 15; no. 1
Main Authors: Lee, Chia Kuang, Bujna, Marián, Abd Jamil, Ahmad Huzaimi, Ee, Pei Theng
Format: Journal Article
Language:English
Published: Reston American Society of Civil Engineers 01-02-2023
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Abstract AbstractPayment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has only looked at the cause and effect of payment problems in the construction industry, not the link between the variables. The purpose of this study is to look at the causes and repercussions of nonpayment, as well as their interactions. The study’s list of causes and consequences was compiled from a literature review, and nine were retrieved. The Decision-Making Trial and Evaluation Laboratory (DEMATEL) technique was used to create a causal relationship between the causes and effects of nonpayment so they may be understood and intervened in. Paymaster’s inadequate financial management (C1), local culture and attitude (C2), document error (C6), contractual provision (C8), and disagreement on the valuation of work done (C9) are the major cause factors, according to the data collected from 13 respondents. The key repercussions, on the other hand, include cash flow problem (E2), bankruptcy and liquidation (E4), project abandonment (E5), delay (E7), and disputes (E8). The conclusions of this study can assist major players in the construction sector, as well as the government, in establishing a strategy to effectively address the nonpayment problem in the industry.
AbstractList Payment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has only looked at the cause and effect of payment problems in the construction industry, not the link between the variables. The purpose of this study is to look at the causes and repercussions of nonpayment, as well as their interactions. The study’s list of causes and consequences was compiled from a literature review, and nine were retrieved. The Decision-Making Trial and Evaluation Laboratory (DEMATEL) technique was used to create a causal relationship between the causes and effects of nonpayment so they may be understood and intervened in. Paymaster’s inadequate financial management (C1), local culture and attitude (C2), document error (C6), contractual provision (C8), and disagreement on the valuation of work done (C9) are the major cause factors, according to the data collected from 13 respondents. The key repercussions, on the other hand, include cash flow problem (E2), bankruptcy and liquidation (E4), project abandonment (E5), delay (E7), and disputes (E8). The conclusions of this study can assist major players in the construction sector, as well as the government, in establishing a strategy to effectively address the nonpayment problem in the industry.
AbstractPayment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has only looked at the cause and effect of payment problems in the construction industry, not the link between the variables. The purpose of this study is to look at the causes and repercussions of nonpayment, as well as their interactions. The study’s list of causes and consequences was compiled from a literature review, and nine were retrieved. The Decision-Making Trial and Evaluation Laboratory (DEMATEL) technique was used to create a causal relationship between the causes and effects of nonpayment so they may be understood and intervened in. Paymaster’s inadequate financial management (C1), local culture and attitude (C2), document error (C6), contractual provision (C8), and disagreement on the valuation of work done (C9) are the major cause factors, according to the data collected from 13 respondents. The key repercussions, on the other hand, include cash flow problem (E2), bankruptcy and liquidation (E4), project abandonment (E5), delay (E7), and disputes (E8). The conclusions of this study can assist major players in the construction sector, as well as the government, in establishing a strategy to effectively address the nonpayment problem in the industry.
Author Lee, Chia Kuang
Abd Jamil, Ahmad Huzaimi
Bujna, Marián
Ee, Pei Theng
Author_xml – sequence: 1
  givenname: Chia Kuang
  surname: Lee
  fullname: Lee, Chia Kuang
  organization: Universiti Malaysia Pahang Senior Lecturer, Faculty of Industrial Management, , Lebuhraya Tun Razak, 26300 Gambang, Pahang, (corresponding author). ORCID: . Email
– sequence: 2
  givenname: Marián
  surname: Bujna
  fullname: Bujna, Marián
  email: marian.bujna@uniag.sk
  organization: Slovak Univ. of Agricultural Associate Professor, Faculty of Engineering, , Tr. A. Hlinku 2, 949 76 Nitra, . ORCID: . Email
– sequence: 3
  givenname: Ahmad Huzaimi
  surname: Abd Jamil
  fullname: Abd Jamil, Ahmad Huzaimi
  organization: Universiti Malaysia Pahang Senior Lecturer, Faculty of Industrial Management, , Lebuhraya Tun Razak, 26300 Gambang, Pahang, . ORCID: . Email
– sequence: 4
  givenname: Pei Theng
  surname: Ee
  fullname: Ee, Pei Theng
  email: peithengee@gmail.com
  organization: Universiti Malaysia Pahang Project Student, Faculty of Industrial Management, , Lebuhraya Tun Razak, 26300 Gambang, Pahang, . Email
BookMark eNp1kM1OwzAQhC1UJNrCO1hwgUOK_x1zMyEUpBQOlLNlJTZt1cYlTg99exK1lBN72dVoZlb6RmBQh9oBcI3RBCOB72_1R5bfFXqCFaMJwxJNUDdckTMwPGmD0y3IBRjFuEJIcEHZEEw1zOwuOmjrCubeu7KFwUML30K9tfuNq1s4C5Vbw0cbXQVDDduFg0_5TM_zAur1V2iW7WJzCc69XUd3ddxj8Pmcz7OXpHifvma6SCwRsk04EUgSRbFQkqRWUuSYRFx4hQWvBGe0VwTi2KlSKYaUoCnDqXTYVySldAxuDr3bJnzvXGzNKuyauntpiKRMMSKV6lwPB1fZhBgb5822WW5sszcYmR6cMT04U2jTgzE9JHME14XFIWxj6f7qf5P_B38AxFtuOw
CitedBy_id crossref_primary_10_1061_JLADAH_LADR_1118
Cites_doi 10.1061/(ASCE)ME.1943-5479.0000319
10.1504/IJMDM.2006.009140
10.1108/13664380580001074
10.1016/j.knosys.2010.01.013
10.1111/1467-8551.00375
10.5130/ajceb.v10i1/2.1592
10.1061/(ASCE)0733-9364(2005)131:8(866)
10.1016/j.eswa.2005.12.005
10.1016/S0263-7863(02)00055-8
10.1016/j.eswa.2006.02.004
10.1080/03610918.2012.735322
10.1017/CBO9780511756245
10.19026/rjaset.5.4475
10.1016/j.ijproman.2006.11.007
10.1016/j.jairtraman.2007.04.008
10.1016/j.ijproman.2011.04.002
10.18517/ijaseit.1.6.125
10.1016/j.eswa.2008.11.040
10.1680/daiitci.28388
10.1057/rlp.2009.11
10.11113/jt.v70.2804
10.22452/jscp.vol1no1.4
10.1016/j.proeng.2011.11.192
ContentType Journal Article
Copyright 2022 American Society of Civil Engineers
Copyright_xml – notice: 2022 American Society of Civil Engineers
DBID AAYXX
CITATION
7TA
7TB
8FD
FR3
JG9
KR7
DOI 10.1061/(ASCE)LA.1943-4170.0000592
DatabaseName CrossRef
Materials Business File
Mechanical & Transportation Engineering Abstracts
Technology Research Database
Engineering Research Database
Materials Research Database
Civil Engineering Abstracts
DatabaseTitle CrossRef
Materials Research Database
Civil Engineering Abstracts
Engineering Research Database
Technology Research Database
Mechanical & Transportation Engineering Abstracts
Materials Business File
DatabaseTitleList Materials Research Database

DeliveryMethod fulltext_linktorsrc
Discipline Law
EISSN 1943-4170
ExternalDocumentID 10_1061__ASCE_LA_1943_4170_0000592
10_1061_ASCE_LA_1943_4170_0000592
GroupedDBID -0O
0R~
29K
4.4
AAIKC
AAMNW
ABBOT
ACIWK
ACNET
ADNWM
ADVLX
ADZKS
AHHRU
ALMA_UNASSIGNED_HOLDINGS
ARKUK
D-I
E70
EBS
GQVBS
HZ~
L7B
O9-
RAC
UCJ
AAYOK
AAYXX
ABTAH
ALNAR
CITATION
EJD
ZY4
7TA
7TB
8FD
FR3
JG9
KR7
ID FETCH-LOGICAL-a267t-52607293169728a730e47056f9165d654330e46051e9c994096384187e1fd2833
IEDL.DBID RAC
ISSN 1943-4162
IngestDate Thu Oct 10 16:05:55 EDT 2024
Fri Aug 23 01:47:49 EDT 2024
Sat Nov 12 04:24:35 EST 2022
IsPeerReviewed true
IsScholarly true
Issue 1
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-a267t-52607293169728a730e47056f9165d654330e46051e9c994096384187e1fd2833
ORCID 0000-0003-4281-5649
0000-0002-1782-3180
0000-0001-6063-8071
PQID 2734942799
PQPubID 2046328
ParticipantIDs proquest_journals_2734942799
crossref_primary_10_1061__ASCE_LA_1943_4170_0000592
asce_journals_10_1061_ASCE_LA_1943_4170_0000592
PublicationCentury 2000
PublicationDate 2023-2-1
2023-02-00
20230201
PublicationDateYYYYMMDD 2023-02-01
PublicationDate_xml – month: 02
  year: 2023
  text: 2023-2-1
  day: 01
PublicationDecade 2020
PublicationPlace Reston
PublicationPlace_xml – name: Reston
PublicationTitle Journal of legal affairs and dispute resolution in engineering and construction
PublicationYear 2023
Publisher American Society of Civil Engineers
Publisher_xml – name: American Society of Civil Engineers
References Azman M. N. A. (e_1_3_3_2_7_1) 2013
Mohammed K. A. (e_1_3_3_2_33_1) 2012; 4
e_1_3_3_2_11_1
e_1_3_3_2_30_1
e_1_3_3_2_10_1
e_1_3_3_2_31_1
Wuni I. Y. (e_1_3_3_2_46_1) 2017; 5
Cotter P. (e_1_3_3_2_12_1) 2005
e_1_3_3_2_29_1
Ezekiel S. A. (e_1_3_3_2_14_1) 2009
e_1_3_3_2_27_1
Yang Y.-P. O. (e_1_3_3_2_47_1) 2008; 5
e_1_3_3_2_26_1
Lip E. (e_1_3_3_2_28_1) 2003; 3
Ye K. M. (e_1_3_3_2_48_1) 2010; 4
Abdul-Rahman H. (e_1_3_3_2_2_1) 2013; 1
e_1_3_3_2_23_1
e_1_3_3_2_24_1
e_1_3_3_2_45_1
Munaaim M. C. (e_1_3_3_2_34_1) 2007; 3
Yu R. (e_1_3_3_2_49_1) 2006; 180
Lim C. F. (e_1_3_3_2_25_1) 2005
e_1_3_3_2_8_1
Halim M. (e_1_3_3_2_18_1) 2010; 52
e_1_3_3_2_3_1
e_1_3_3_2_6_1
e_1_3_3_2_5_1
Reeves K. (e_1_3_3_2_38_1) 2003; 1
e_1_3_3_2_21_1
e_1_3_3_2_44_1
Ansah S. K. (e_1_3_3_2_4_1) 2011; 1
e_1_3_3_2_22_1
e_1_3_3_2_43_1
Haseeb M. (e_1_3_3_2_20_1) 2011; 1
e_1_3_3_2_42_1
e_1_3_3_2_41_1
e_1_3_3_2_40_1
e_1_3_3_2_17_1
Mohamad M. (e_1_3_3_2_32_1) 2012; 4
e_1_3_3_2_16_1
Badroldin M. K. A. M. (e_1_3_3_2_9_1) 2016; 28
e_1_3_3_2_19_1
e_1_3_3_2_39_1
e_1_3_3_2_13_1
e_1_3_3_2_36_1
e_1_3_3_2_15_1
e_1_3_3_2_35_1
Ramus J. (e_1_3_3_2_37_1) 2006
References_xml – ident: e_1_3_3_2_29_1
  doi: 10.1061/(ASCE)ME.1943-5479.0000319
– volume: 3
  start-page: 35
  issue: 1
  year: 2007
  ident: e_1_3_3_2_34_1
  article-title: Is late or non-payment a significant problem to Malaysian contractors
  publication-title: J. Des. Built Environ.
  contributor:
    fullname: Munaaim M. C.
– volume: 3
  start-page: 1
  issue: 41
  year: 2003
  ident: e_1_3_3_2_28_1
  article-title: Construction payment blues–Why that domino effect
  publication-title: Davis Langdon Seah Consult. Execut. Summaries Pract.
  contributor:
    fullname: Lip E.
– ident: e_1_3_3_2_11_1
  doi: 10.1504/IJMDM.2006.009140
– volume: 4
  start-page: 120
  issue: 2
  year: 2012
  ident: e_1_3_3_2_33_1
  article-title: Causes of delay in Nigeria construction industry
  publication-title: Interdiscip. J. Contemp. Res. Bus.
  contributor:
    fullname: Mohammed K. A.
– volume-title: Experian’s Business Information Division
  year: 2005
  ident: e_1_3_3_2_12_1
  contributor:
    fullname: Cotter P.
– volume: 1
  start-page: 41
  issue: 5
  year: 2011
  ident: e_1_3_3_2_20_1
  article-title: Problems of projects and effects of delays in the construction industry of Pakistan
  publication-title: Aust. J. Bus. Manage. Res.
  contributor:
    fullname: Haseeb M.
– ident: e_1_3_3_2_35_1
  doi: 10.1108/13664380580001074
– volume: 52
  start-page: 28
  issue: 20
  year: 2010
  ident: e_1_3_3_2_18_1
  article-title: The contracting firm’s failure and financial related factors: A case study of Malaysian contracting firms
  publication-title: Int. Res. J. Finance Econ.
  contributor:
    fullname: Halim M.
– volume-title: The Malaysia construction industry—The present dilemmas of the unpaid contractors
  year: 2005
  ident: e_1_3_3_2_25_1
  contributor:
    fullname: Lim C. F.
– ident: e_1_3_3_2_40_1
  doi: 10.1016/j.knosys.2010.01.013
– volume: 180
  start-page: 63
  issue: 1
  year: 2006
  ident: e_1_3_3_2_49_1
  article-title: A soft computing method for multi-criteria decision making with dependence and feedback
  publication-title: Appl. Math. Comput.
  contributor:
    fullname: Yu R.
– volume: 4
  start-page: 503
  issue: 5
  year: 2010
  ident: e_1_3_3_2_48_1
  article-title: Risk of late payment in the Malaysian construction industry
  publication-title: Int. J. Mech. Ind. Eng.
  contributor:
    fullname: Ye K. M.
– volume-title: Principles and practice of MAS communication
  year: 2009
  ident: e_1_3_3_2_14_1
  contributor:
    fullname: Ezekiel S. A.
– volume: 4
  start-page: 22
  issue: 5
  year: 2012
  ident: e_1_3_3_2_32_1
  article-title: The adequacy of contractual provisions in managing construction failure in Malaysia
  publication-title: Eur. J. Bus. Manage.
  contributor:
    fullname: Mohamad M.
– ident: e_1_3_3_2_43_1
  doi: 10.1111/1467-8551.00375
– volume: 28
  start-page: 149
  issue: 3
  year: 2016
  ident: e_1_3_3_2_9_1
  article-title: Late payment practices in the Malaysian construction industry
  publication-title: Malaysian J. Civ. Eng.
  contributor:
    fullname: Badroldin M. K. A. M.
– ident: e_1_3_3_2_17_1
  doi: 10.5130/ajceb.v10i1/2.1592
– ident: e_1_3_3_2_42_1
– ident: e_1_3_3_2_5_1
  doi: 10.1061/(ASCE)0733-9364(2005)131:8(866)
– ident: e_1_3_3_2_45_1
  doi: 10.1016/j.eswa.2005.12.005
– volume-title: Payment scenario in the Malaysian construction industry prior to CIPAA
  year: 2013
  ident: e_1_3_3_2_7_1
  contributor:
    fullname: Azman M. N. A.
– ident: e_1_3_3_2_16_1
  doi: 10.1016/S0263-7863(02)00055-8
– ident: e_1_3_3_2_44_1
  doi: 10.1016/j.eswa.2006.02.004
– ident: e_1_3_3_2_41_1
  doi: 10.1080/03610918.2012.735322
– volume: 5
  start-page: 160
  issue: 3
  year: 2008
  ident: e_1_3_3_2_47_1
  article-title: A novel hybrid MCDM model combined with DEMATEL and ANP with applications
  publication-title: Int. J. Oper. Res.
  contributor:
    fullname: Yang Y.-P. O.
– ident: e_1_3_3_2_10_1
  doi: 10.1017/CBO9780511756245
– ident: e_1_3_3_2_15_1
  doi: 10.19026/rjaset.5.4475
– ident: e_1_3_3_2_39_1
  doi: 10.1016/j.ijproman.2006.11.007
– ident: e_1_3_3_2_27_1
  doi: 10.1016/j.jairtraman.2007.04.008
– ident: e_1_3_3_2_13_1
– ident: e_1_3_3_2_31_1
  doi: 10.1016/j.ijproman.2011.04.002
– ident: e_1_3_3_2_21_1
– volume: 1
  start-page: 4
  issue: 2003
  year: 2003
  ident: e_1_3_3_2_38_1
  article-title: Pay up
  publication-title: JUBM Constr. News Views
  contributor:
    fullname: Reeves K.
– ident: e_1_3_3_2_30_1
  doi: 10.18517/ijaseit.1.6.125
– volume-title: Contract practice for surveyors
  year: 2006
  ident: e_1_3_3_2_37_1
  contributor:
    fullname: Ramus J.
– ident: e_1_3_3_2_24_1
– volume: 1
  start-page: 27
  issue: 1
  year: 2011
  ident: e_1_3_3_2_4_1
  article-title: Causes and effects of delayed payments by clients on construction projects in Ghana
  publication-title: J. Constr. Project Manage. Innov.
  contributor:
    fullname: Ansah S. K.
– ident: e_1_3_3_2_26_1
  doi: 10.1016/j.eswa.2008.11.040
– ident: e_1_3_3_2_22_1
  doi: 10.1680/daiitci.28388
– ident: e_1_3_3_2_3_1
  doi: 10.1057/rlp.2009.11
– ident: e_1_3_3_2_6_1
– ident: e_1_3_3_2_8_1
  doi: 10.11113/jt.v70.2804
– ident: e_1_3_3_2_23_1
  doi: 10.22452/jscp.vol1no1.4
– volume: 5
  start-page: 12
  issue: 7
  year: 2017
  ident: e_1_3_3_2_46_1
  article-title: Critical causes and effects of payment delays in the execution of public construction projects in Ghana: Fresh evidence from the Brong-Ahafo region
  publication-title: Dev. Country Stud.
  contributor:
    fullname: Wuni I. Y.
– ident: e_1_3_3_2_36_1
– ident: e_1_3_3_2_19_1
  doi: 10.1016/j.proeng.2011.11.192
– volume: 1
  start-page: 8
  issue: 1
  year: 2013
  ident: e_1_3_3_2_2_1
  article-title: Cause, effect and reaction for late-payment and non-payment issues in Malaysian building sector
  publication-title: Topclass J. Bus. Manage. Innov.
  contributor:
    fullname: Abdul-Rahman H.
SSID ssj0065634
Score 2.2684383
Snippet AbstractPayment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research...
Payment is regarded to be the construction industry’s lifeblood. Late and nonpayment concerns have plagued the construction industry. Previous research has...
SourceID proquest
crossref
asce
SourceType Aggregation Database
Publisher
SubjectTerms Algorithms
Bankruptcy
Construction industry
Decision making
Financial management
Literature reviews
Scholarly Paper
Scholarly Papers
Title A Cause and Effect of a Nonpayment Model Based on the DEMATEL Algorithm
URI http://ascelibrary.org/doi/abs/10.1061/(ASCE)LA.1943-4170.0000592
https://www.proquest.com/docview/2734942799
Volume 15
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://sdu.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV07T8MwELZoWVh4IwoFeWCAIdC84zGElg5RB1oktugSOwWpJFXTCvHvucujqEslJNYodk53vrvvYvs7xm4AbMDACJpugadZjkw0SMHQYscgejhbipguJw_H7ujNe-oTTU5zmhCKRK25HhbTkl8A4qr5CGaeh1t_HPTvQv8ea29Ts3S3VxIQ2gKj8C5t-NMif_GDJhgjWqk3lsvXHaPhHd06F4ZnEmQzVW1G6jL9DA7-QfBDtl9jT-5Xi-WI7ajsmLVC-Dphzz4PYFUoDpnkFaMxz1MOfJRnc_imX4ic2qbN-COmPcnzjCNy5GhFf9IPuT-b5ouP5fvnKXsd9CfBUKt7LGhgOO4S61CHuMNN3RGu4QH6u7JcBEUpwkZb0sVTeoI1j65EIgRWg-iwlu65Sk8lQhPzjLWzPFPnjGOuTyRWvBJM1-qBjYDYE3SGNjXNJFZOh5VaimonKaJy_9vRI1JNFPoRqSYi1US1ajrMbAwQzSvyjfWgbaO6ja1-v0UsPsIyXCEu_izGJdujJvPVWe0uay8XK3XFWoVcXZeL7Qeo5MV5
link.rule.ids 315,782,786,3256,10076,27933,27934,76201,76209
linkProvider American Society of Civil Engineers
linkToHtml http://sdu.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV07T8MwELZoGWDhjSgU8MAAQ6B5x2MIKUWEDrRIbNY1dgpSSaqmFeLfc86jqAsSEmsUO9ad7-67-PwdIRcANqBjBE23wNMsR8QaJGBoI8dQ9HC2YCN1Obk3cPuv3l2oaHLqakLIY7nkepiNC34BGJXNRzDy3Fz6gyC8ivxrzL1NzdLdTkFAaDP0wuto1x1lm89-UDtjRCvVwXLxumPUvKO_zoXuWS1kNVSteuoi_HS3_2HhO2Srwp7ULzfLLlmT6R5pRPC5T-59GsAilxRSQUtGY5olFGg_S6fwpX4hUtU2bUJvMewJmqUUkSNFLfrDMKL-ZJzN3udvHwfkpRsOg55W9VjQwHDcOeahjuION3WHuYYHaO_SchEUJQgbbaEunqonmPPoksWMYTaIBmvpniv1RCA0MQ9JM81SeUQoxvpYYMYrwHStDtgIiD2mamgT04xH0mmRQkq8MpKcF-ffjs6VaHjkcyUarkTDK9G0iFkrgE9L8o3loN9GtWtd_XxLsfgwy3AZO_7zMs7JRm_4FPHoof94QjZVw_mybrtNmvPZQp6SRi4WZ8XG-wYRo8hl
linkToPdf http://sdu.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1LT8MwDI7YkBAX3ojBgBw4wKGwvtLmWPZgiGpCbEjcIq9JB9Jopz2E-Pc4fQztMgmJa9Wklh3bnxvnCyFXAC5gYATDdMA3HCYjA2KwjCGzND2cK_lQH07u9r3em99qa5qcspsQZpFacj1MRxm_wETGeZnJzLvroN9s34TBLdbetuGYXiMjIHQ5RuFN9OuGXtgvQbMMxohWio3l7HVmlbyja-fC8KwFWU1Vq5E6Sz-d3X8QfI_sFNiTBvli2ScbKjkglRC-DslDQJuwmCkKiaQ5ozFNYwq0lyYT-Na_EKm-Nm1M7zHtSZomFJEjRSsGg3ZIg_EonX7M3z-PyGunPWh2jeKOBQMs5s2xDmWaO9w2GfcsH9DfleMhKIoRNrpSHzzVT7DmMRWPOMdqEB3WMX1PmbFEaGIfk2qSJuqEUMz1kcSKV4LtOQ1wERD7XPfQxrYdDRWrkUxLonCSmcj2v5kptGpEGAitGqFVIwrV1IhdGkBMcvKN5aB1o-qlrX6_pVl8uGN5nJ_-WYxLsvXc6ojwsfd0Rrb1ffN523adVOfThTonlZlcXGTr7gdqTcgZ
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+Cause+and+Effect+of+a+Nonpayment+Model+Based+on+the+DEMATEL+Algorithm&rft.jtitle=Journal+of+legal+affairs+and+dispute+resolution+in+engineering+and+construction&rft.au=Chia+Kuang+Lee&rft.au=Bujna%2C+Mari%C3%A1n&rft.au=Ahmad+Huzaimi+Abd+Jamil&rft.au=Pei%2C+Theng+Ee&rft.date=2023-02-01&rft.pub=American+Society+of+Civil+Engineers&rft.issn=1943-4162&rft.eissn=1943-4170&rft.volume=15&rft.issue=1&rft_id=info:doi/10.1061%2F%28ASCE%29LA.1943-4170.0000592&rft.externalDBID=NO_FULL_TEXT
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1943-4162&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1943-4162&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1943-4162&client=summon