Some Specifications of the PGU-800 Combined-Cycle Power Unit of the Perm TPP
The paper presents the main specificatons of the Perm TPP and its main equipment, as well as their change resulting from the commissioning of PGU-800 power unit 4 after start-up and warranty tests at the PGU-800 start-up facility and comprehensive testing and power certification of the unit. The sco...
Saved in:
Published in: | Power technology and engineering Vol. 53; no. 2; pp. 213 - 216 |
---|---|
Main Authors: | , , , |
Format: | Journal Article |
Language: | English |
Published: |
New York
Springer US
2019
Springer Nature B.V |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The paper presents the main specificatons of the Perm TPP and its main equipment, as well as their change resulting from the commissioning of PGU-800 power unit 4 after start-up and warranty tests at the PGU-800 start-up facility and comprehensive testing and power certification of the unit. The scope and procedure of construction, installation, and setup and adjustment and the results of the tests carried out after their completion are described. The tests demonstrated the main technical, economic, and environmental characteristics of the unit and main equipment, operational flexibility, startup duration, operating range, load change rate in this range. |
---|---|
ISSN: | 1570-145X 1570-1468 |
DOI: | 10.1007/s10749-019-01062-4 |