Search Results - "Yu, Chuhang"
-
1
An integrated flight scheduling and fleet assignment method based on a discrete choice model
Published in Computers & industrial engineering (01-08-2016)“…•We propose a new integrated flight scheduling and fleet assignment method using the discrete choice model.•We extend the model to consider itinerary price…”
Get full text
Journal Article -
2
A 0–1 mixed‐integer program‐based group‐and‐release strategy for solving the integrated runway scheduling and taxiway routing problem
Published in Naval research logistics (01-10-2022)“…With growing air traffic demand and the required airport infrastructure lagging behind by at least a decade, it has become imperative for air traffic…”
Get full text
Journal Article -
3
A time-space network flow approach to dynamic repositioning in bicycle sharing systems
Published in Transportation research. Part B: methodological (01-09-2017)“…•An integrated model is proposed to simultaneously consider the user dissatisfaction forecasting, bicycle repositioning and vehicle routing.•An efficient…”
Get full text
Journal Article -
4
An adaptive large neighborhood search heuristic for solving a robust gate assignment problem
Published in Expert systems with applications (30-10-2017)“…•Robust gate assignment problem with transfer passengers and tows is considered.•A large neighborhood search heuristic is proposed to solve the integrated…”
Get full text
Journal Article -
5
An optimization-based decision support tool for air cargo loading
Published in Computers & industrial engineering (01-01-2023)“…In this research, we study the air cargo loading problem that aims to assign cargo containers to appropriate loading positions within a freight carrier…”
Get full text
Journal Article -
6
MIP-based heuristics for solving robust gate assignment problems
Published in Computers & industrial engineering (01-03-2016)“…•We transit the quadratic objective function to an equivalent linear one.•The first one to adapt general MIP solving methods to solve GAP.•Propose four methods…”
Get full text
Journal Article -
7
A two stage heuristic algorithm for the integrated aircraft and crew schedule recovery problems
Published in Computers & industrial engineering (01-09-2015)“…•We propose a new heuristic algorithm for the integrated aircraft and crew schedule recovery problem.•We propose a new model for the integrated aircraft and…”
Get full text
Journal Article -
8
A heuristic approach for solving an integrated gate reassignment and taxi scheduling problem
Published in Journal of air transport management (01-07-2017)“…Capacity limitation of airport ground operation is one of the major limiting factors in air traffic operation. The congestion on the gate and taxiway causes…”
Get full text
Journal Article -
9
A math-heuristic algorithm for the integrated air service recovery
Published in Transportation research. Part B: methodological (01-02-2016)“…•We propose a novel three stage math-heuristic algorithm for integrated air service recovery problem.•We propose efficient models and algorithms for each…”
Get full text
Journal Article