Search Results - "Yalaoui, F."

Refine Results
  1. 1

    Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling by Berrichi, A., Yalaoui, F., Amodeo, L., Mezghiche, M.

    Published in Computers & operations research (01-09-2010)
    “…This paper presents an algorithm based on Ant Colony Optimization paradigm to solve the joint production and maintenance scheduling problem. This approach is…”
    Get full text
    Journal Article
  2. 2

    Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem by Berrichi, A., Amodeo, L., Yalaoui, F., Châtelet, E., Mezghiche, M.

    Published in Journal of intelligent manufacturing (01-08-2009)
    “…This paper deals with the joint production and maintenance scheduling problem according to a new bi-objective approach. This method allows the decision maker…”
    Get full text
    Journal Article
  3. 3

    Ant colony optimization for solving an industrial layout problem by Hani, Y., Amodeo, L., Yalaoui, F., Chen, H.

    Published in European journal of operational research (01-12-2007)
    “…This paper presents ACO_GLS, a hybrid ant colony optimization approach coupled with a guided local search, applied to a layout problem. ACO_GLS is applied to…”
    Get full text
    Journal Article
  4. 4

    Optimization of natural gas pipeline transportation using ant colony optimization by Chebouba, A., Yalaoui, F., Smati, A., Amodeo, L., Younsi, K., Tairi, A.

    Published in Computers & operations research (01-06-2009)
    “…In this paper, an ant colony optimization (ACO) algorithm is proposed for operations of steady flow gas pipeline. The system is composed of compressing…”
    Get full text
    Journal Article
  5. 5

    New method to minimize the preventive maintenance cost of series–parallel systems by Bris, R., Châtelet, E., Yalaoui, F.

    Published in Reliability engineering & system safety (01-12-2003)
    “…General preventive maintenance model for input components of a system, which improves the reliability to ‘as good as new,’ was used to optimize the maintenance…”
    Get full text
    Journal Article
  6. 6

    New methods to minimize the preventive maintenance cost of series–parallel systems using ant colony optimization by Samrout, M., Yalaoui, F., Châtelet, E., Chebbo, N.

    Published in Reliability engineering & system safety (01-09-2005)
    “…This article is based on a previous study made by Bris, Châtelet and Yalaoui [Bris R, Chatelet E, Yalaoui F. New method to minimise the preventive maintenance…”
    Get full text
    Journal Article
  7. 7

    Efficient combined immune-decomposition algorithm for optimal buffer allocation in production lines for throughput and profit maximization by Massim, Y., Yalaoui, F., Amodeo, L., Chatelet, E., Zeblah, A.

    Published in Computers & operations research (01-04-2010)
    “…Adequate allocation of buffers in transfer lines is crucial to the optimization of line throughput and work in process (WIP) inventory. Their optimal…”
    Get full text
    Journal Article
  8. 8

    Reliability allocation through cost minimization by Elegbede, A.O.C., Chengbin Chu, Adjallah, K.H., Yalaoui, F.

    Published in IEEE transactions on reliability (01-03-2003)
    “…This paper considers the allocation of reliability and redundancy to parallel-series systems, while minimizing the cost of the system. It is proven that under…”
    Get full text
    Journal Article
  9. 9

    Efficient immune algorithm for optimal allocations in series-parallel continuous manufacturing systems by Massim, Y., Yalaoui, F., Chatelet, E., Yalaoui, A., Zeblah, A.

    Published in Journal of intelligent manufacturing (01-10-2012)
    “…This paper uses an immune algorithm (IA) meta-heuristic optimization method to solve the problem of structure optimization of series-parallel production…”
    Get full text
    Journal Article
  10. 10

    New exact method to solve the Pm/rj/[summation operator]Cj schedule problem by Chu, C, Yalaoui, F

    “…This paper addresses a parallel machine scheduling problem (PMSP) with release dates to minimize sum of completion time. This problem presents numerous…”
    Get full text
    Journal Article
  11. 11

    Parameter’s setting of the ant colony algorithm applied in preventive maintenance optimization by Samrout, M., Kouta, R., Yalaoui, F., Châtelet, E., Chebbo, N.

    Published in Journal of intelligent manufacturing (01-12-2007)
    “…Meta-heuristic applications have evolved a lot nowadays and have been used in many domains. However, their parameter setting stills, till now, a serious…”
    Get full text
    Journal Article
  12. 12

    Solving a realistic hybrid and flexible flow shop scheduling problem through constraint programming: industrial case in a packaging company by Oujana, S., Amodeo, L., Yalaoui, F., Brodart, D.

    “…This paper deals with an application of constraint programming (CP) for a hybrid flexible flow shop scheduling problem (HFFS) with realistic features, such as…”
    Get full text
    Conference Proceeding
  13. 13

    Unrelated parallel machines scheduling with dependent setup times in textile industry by Berthier, A., Yalaoui, A., Chehade, H., Yalaoui, F., Amodeo, L., Bouillot, C.

    Published in Computers & industrial engineering (01-12-2022)
    “…The problem tackled in this paper is an unrelated parallel machines scheduling problem with machine and sequence dependent setup times, machine eligibility and…”
    Get full text
    Journal Article
  14. 14

    Parallel machine scheduling to minimize total tardiness by Yalaoui, Farouk, Chu, Chengbin

    “…This paper addresses, using an exact method, the identical parallel machine scheduling problem to minimize total tardiness. In this problem, a set of jobs has…”
    Get full text
    Journal Article
  15. 15

    A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times by Nait Tahar, Djamel, Yalaoui, Farouk, Chu, Chengbin, Amodeo, Lionel

    “…In this study, we consider the problem of scheduling a set of independent jobs with sequence-dependent setup times and job splitting, on a set of identical…”
    Get full text
    Journal Article
  16. 16

    New exact method to solve the Pm/rj/SigmaCj schedule problem by Yalaoui, F, Chu, C

    “…This paper addresses a parallel machine scheduling problem (PMSP) with release dates to minimize sum of completion time. This problem presents numerous…”
    Get full text
    Journal Article
  17. 17

    New exact method to solve the Pm/r j/∑C j schedule problem by Yalaoui, F., Chu, C.

    “…This paper addresses a parallel machine scheduling problem (PMSP) with release dates to minimize sum of completion time. This problem presents numerous…”
    Get full text
    Journal Article
  18. 18

    On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization by Adzakpa, Kossi P., Adjallah, Kondo H., Yalaoui, Farouk

    Published in Journal of intelligent manufacturing (01-04-2004)
    “…A heuristic-based optimization algorithm is proposed in this paper for on-line scheduling and assignment of preventive maintenance jobs to processors, to…”
    Get full text
    Journal Article
  19. 19

    An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times by YALAOUI, FAROUK, CHU, CHENGBIN

    Published in IIE transactions (01-02-2003)
    “…In this paper, we consider a simplified real-life identical parallel machine scheduling problem with sequence-dependent setup times and job splitting to…”
    Get full text
    Journal Article
  20. 20

    A Branch-and-Bound to solve the scheduling problem Pm/rj/ΣTj by Yalaoui, F.

    “…This paper presents the first study for the total tardiness minimization on parallel machine scheduling problem with different release dates of jobs. In this…”
    Get full text
    Conference Proceeding