Search Results - "Stemler, G."

  • Showing 1 - 9 results of 9
Refine Results
  1. 1

    Differential gauging and tracer tests resolve seepage fluxes in a strongly-losing stream by Ruehl, C., Fisher, A.T., Hatch, C., Huertos, M. Los, Stemler, G., Shennan, C.

    Published in Journal of hydrology (Amsterdam) (30-10-2006)
    “…The Pajaro River, central coastal California, consistently loses 0.2–0.4 m 3/s of discharge along an 11.42-km experimental reach late in the water year, when…”
    Get full text
    Journal Article
  2. 2

    Spatial and temporal variations in streambed hydraulic conductivity quantified with time-series thermal methods by Hatch, Christine E., Fisher, Andrew T., Ruehl, Chris R., Stemler, Greg

    Published in Journal of hydrology (Amsterdam) (11-08-2010)
    “…We gauged and instrumented an 11.42-km long experimental reach of the Pajaro River, central coastal California, to determine rates of streambed seepage (loss…”
    Get full text
    Journal Article
  3. 3

    RETEX (RElay Testing EXpert): an expert system for analysis of relay testing data by Sun, Y., Liu, C.-C., Christie, R.D., Nordstrom, J., Hofmann, M., Stemler, G., Thurein, I.

    Published in IEEE transactions on power delivery (01-04-1992)
    “…An expert system which is applied to power system protective relay evaluation testing is described. An expert system called RETEX (relay testing expert) has…”
    Get full text
    Journal Article Conference Proceeding
  4. 4

    Crowd Behavior as "Risky Shift": A Laboratory Experiment by Johnson, Norris R., Stemler, James G., Hunter, Deborah

    Published in Sociometry (01-06-1977)
    “…Crowd behavior is conceptualized as a result of a shift to risk. a number of collective protest actions are arrayed on a "riskiness" dimension to produce a…”
    Get full text
    Journal Article
  5. 5

    RETEX (RElay Testing EXpert): an expert system for analysis of relay testing data by Sun, Y., Liu, C.-C., Christie, R.D., Nordstrom, J., Hofmann, M., Stemler, G., Thurein, I.

    “…A new expert system application to power system protective relay evaluation testing, a crucial but time-consuming engineering task, is presented. An expert…”
    Get full text
    Conference Proceeding
  6. 6

    BPA's field test evaluation of 500-kV PCB's rated to limit line switching overvoltages to 1.5 per unit by Stemler, G.E.

    “…Since 1968 Bonneville Power Administration (BPA) has purchased 500-kV PCB's required to limit line switching overvoltages to 1.5 per unit or less. This paper…”
    Get full text
    Journal Article
  7. 7

    A New Series Capacitor Protection Scheme Using Nonlinear Resistors by Courts, A. L., Hingorani, N. G., Stemler, G. E.

    “…A new series capacitor protection scheme that limits capacitor overvoltages by inserting a nonlinear resistor in parallel with the capacitor bank during faults…”
    Get full text
    Journal Article
  8. 8
  9. 9

    A Fast Response Instrument for Measurement of Power System Phase Angles by Raupach, Richard C., Stemler, Gary E.

    “…A phase-angle measuring device is described which has a response time of one cycle of the signals whose phase angles are being measured. It has an adjustable…”
    Get full text
    Journal Article