Search Results - "Spence, R.E."

  • Showing 1 - 4 results of 4
Refine Results
  1. 1

    Designing an integrated procedures system by Sturdivant, M.H., Allred, C.D., Grider, D.A., Holloran, R.W., Johnson, R.W., Keele, R.P., Luna, S.F., Spence, R.E., Thomason, J.D., Thomason, S.A., Norman, R.L.

    “…The system described was designed to meet the particular safety requirements of the nuclear industry and to correct the problems industry experience has…”
    Get full text
    Conference Proceeding
  2. 2

    Upgrading procedure production and delivery systems by Sturdivant, M.H., Allred, C.D., Grider, D.A., Holloran, R.W., Johnson, R.W., Keele, R.P., Luna, S.F., Spence, R.E., Thomason, J.D., Thomason, S.A., Norman, R.L.

    “…New procedure production and delivery systems are outlined which are needed to supply enough high-quality procedures to avert human performance errors in…”
    Get full text
    Conference Proceeding
  3. 3

    An integrated procedures system as a management tool by Sturdivant, M.H., Allred, C.D., Grider, D.A., Holloran, R.W., Johnson, R.W., Keele, R.P., Luna, S.F., Spence, R.E., Thomason, J.D., Thomason, S.A., Norman, R.L.

    “…An examination of industry procedures problems shows that a faulty procedures system is the root cause of most procedures deficiencies. An integrated…”
    Get full text
    Conference Proceeding
  4. 4

    Testing: closing the loop through verification and validation of procedures by Sturdivant, M.H., Allred, C.D., Grider, D.A., Holloran, R.W., Johnson, R.W., Keele, R.P., Luna, S.F., Spence, R.E., Thomason, J.D., Thomason, S.A., Norman, R.L.

    “…The testing phase in an integrated procedures system for nuclear power plants is described. Testing through verification ensures technical accuracy and written…”
    Get full text
    Conference Proceeding