Search Results - "Rossano, Graham"

  • Showing 1 - 6 results of 6
Refine Results
  1. 1

    ITER CS Module Test Facility Operational Lessons From CS Modules 1-4 by Khumthong, Kenneth, Ortiz, Edward, Sheeron, Jeffery, Fledderman, Bryce, Norausky, Nikolai, Smith, John, Patlan, Steve, Martovetsky, Nicolai, Freudenberg, Kevin, Rossano, Graham, Wooley, Kyle, Schild, Thierry, Mitchell, Neil, Miyoshi, Yasuyuki, Langhorn, Alan

    “…General Atomics (GA) is under contract to UT-Battelle c/o Oak Ridge National Laboratory for the fabrication of ITER Central Solenoid Modules (CSM). GA will…”
    Get full text
    Journal Article
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6

    Start of the ITER Central Solenoid Assembly by Schild, T., Bruton, A., Cormany, C., Gauthier, F., Jong, C., Liao, M., Mitchell, N., Mariani, A., Miyoshi, Y., Martovetsky, N., Everitt, D., Freudenberg, K., Vandergriff, D., Hughes, D., Rossano, G., Smith, J., Potts, R., Stephens, A., Decool, P., Nguyen Thanh Dao, C.

    “…The Central Solenoid (CS) is a key element of the ITER Magnet system, including six identical coils, called modules, assembled together to form a 4 m outer…”
    Get full text
    Journal Article