Search Results - "Perišić, Martina"

  • Showing 1 - 16 results of 16
Refine Results
  1. 1

    Reliability and validity of organizational factors measurement in risk management of process industry equipment by Golubović, Tamara, Spasojević-Brkić, Vesna, Perišić, Martina

    “…In recent decades, process safety control and process safety risk assessment have become very attractive topics. The way control is carried out, using tools…”
    Get full text
    Journal Article
  2. 2

    Safety communication in mining companies: Differences across organizational structure by Spasojević-Brkić, Vesna, Mihajlović, Ivan, Perišić, Martina, Janev, Nemanja, Rakonjac, Ivan

    “…For mining processes to operate safely, information about safety is crucial. Numerous authors pay attention to fostering a good safety climate without paying…”
    Get full text
    Journal Article
  3. 3

    "Improve" and "Control" tools in assembly of micro components: A case study by Janev, Nemanja, Spasojević-Brkić, Vesna, Misita, Mirjana, Perišić, Martina, Papić, Neda

    Published in Tehnika (Beograd) (2023)
    “…The process of assembling micro components requires careful planning where precise and reliable data collecting is necessary due to a short production cycle…”
    Get full text
    Journal Article
  4. 4

    Novel risk management integrated model implementation: Comparison between manufacturing and service companies by Alheriani, Nuri, Spasojević-Brkić, Vesna, Perišić, Martina

    “…Till now a framework to define a common and unified standard model for integrated risk management systems, which is suitable to be used in all contingency…”
    Get full text
    Journal Article
  5. 5

    Pareto analysis in bulldozer's failures and stoppages risk management by Spasojević-Brkić, Vesna, Perišić, Martina, Veljković, Zorica, Misita, Mirjana, Damjanović, Milanko

    “…Research related to risk management of failures and stoppages in the operation of bulldozer is very limited, so this topic needs more attention. This study…”
    Get full text
    Journal Article
  6. 6

    Kaizen implementation context and performance by Spasojević-Brkić, Vesna, Tomić, Branislav, Perišić, Martina, Brkić, Aleksandar

    “…Quality improvement implies the application of quality tools, techniques, methodologies and applications. Through their proper use, the desired level of…”
    Get full text
    Journal Article
  7. 7

    Integrated risk management model implementation's contextual dependence on company size by Alherian, Nuri, Spasojević-Brkić, Vesna, Perišić, Martina, Alsharif, Abdulghder

    Published in Tehnika (Beograd) (2021)
    “…Novel integrated risk management model for standardized management systems, such as ISO 9001:2015 for quality management systems, ISO 14001:2015 for…”
    Get full text
    Journal Article
  8. 8

    Dumper operation risk analysis model and HAMRISK expert system by Misita, Mirjana, Spasojević-Brkić, Vesna, Rakonjac, Ivan, Damjanović, Milanko, Perišić, Martina, Papić, Neda, Đurić, Goran

    Published in Tehnika (Beograd) (2022)
    “…The paper presents a model of risk analysis of dumper operation with the aim of determining the most common reason for unplanned stoppages, as well as, after…”
    Get full text
    Journal Article
  9. 9

    Pareto analysis application in research of crane related accidents by Brkić, Aleksandar, Misita, Mirjana, Spasojević-Brkić, Vesna, Perišić, Martina

    Published in Tehnika (Beograd) (2020)
    “…Previous research show that the safety aspects of cranes are not well researched. So, the first aim of this research is to collect and analyze data about crane…”
    Get full text
    Journal Article
  10. 10

    Transport and mining machinery cabins' ergonomic evaluation as a path to its redesign by Spasojević Brkić, Vesna, Mihajlović, Ivan, Brkić, Aleksandar, Misita, Mirjana, Perišić, Martina

    “…Transport and mining machinery cabins are still not well adapted to their users, while checklists for their evaluation are not common in the literature. This…”
    Get full text
    Journal Article
  11. 11

    Differences in attitudes of operators and managers on risk management of pressure equipment by Golubović, Tamara, Spasojević Brkić, Vesna, Perišić, Martina, Brkic, Aleksandar

    “…Objectives. Previous research indicates that models for risk assessment of pressure equipment have not sufficiently or adequately integrated indicators of…”
    Get full text
    Journal Article
  12. 12

    Differences in Kaizen implementation between countries and industry types in multinational supply chain by Spasojević-Brkić, Vesna, Tomić, Branislav, Perišić, Martina, Janev, Nemanja

    Published in FME transactions (2023)
    “…Previous research shows that Kaizen's benefits are multiple and evident, but its practices in the supply chain have been sufficiently examined now. Conversely,…”
    Get full text
    Journal Article
  13. 13

    Validating Measurement Structure of Checklist for Evaluating Ergonomics Risks in Heavy Mobile Machinery Cabs by Spasojević Brkić, Vesna, Misita, Mirjana, Perišić, Martina, Brkić, Aleksandar, Veljković, Zorica

    Published in Mathematics (Basel) (01-01-2023)
    “…Heavy mobile machinery cabs and their equipment are still not well adjusted to operators, so it is not surprising that we are still witnessing huge…”
    Get full text
    Journal Article
  14. 14

    The safety climate, hierarchical levels and resilience assessment in transport and mining companies by Alsharif, Abdulghder Mohamed, Spasojević Brkić, Vesna, Misita, Mirjana, Mihajlović, Ivan, Brkić, Aleksandar, Papić, Neda, Perišić, Martina

    “…Transport and mining companies are vulnerable to a variety of hazards, and this paper offers a novel conceptual framework for organisational resilience…”
    Get full text
    Journal Article
  15. 15

    The economic feasibility of crane cabins with real-time computer-aided visual guidance system by Dondur, Nikola, Spasojević-Brkić, Vesna, Brkić, Aleksandar, Perišić, Martina

    Published in Serbian journal of management (01-01-2020)
    “…Cranes’ operations are extremely risky and hazardous tasks, as demonstrated in various surveys in the field of incidents’ causes and effects. The most frequent…”
    Get full text
    Journal Article
  16. 16

    Excavator downtime's differences between types and comparison with other mining equipment by Spasojević-Brkić Vesna, Mihajlović Ivan, Misita Mirjana, Perišić Martina, Janev Nemanja

    “…Mining equipment working time is critical for ensuring output and fulfilling mining project deadlines. In order to find trends and possible downtime…”
    Get full text
    Journal Article