Search Results - "Pasternack, B.M."
-
1
The Rockport plant-analysis of temporary fast turbine valving tests
Published in IEEE transactions on power systems (01-05-1988)“…Temporary fast turbine valving (TFTV) field tests were carried out on AEP's 1300 MW Rockport unit. Tests at various unit loading levels verified the functional…”
Get full text
Journal Article Conference Proceeding -
2
Analysis of a generator step-up transformer failure following faulty synchronization
Published in IEEE transactions on power delivery (01-07-1988)“…An analysis was carried out to investigate an out-of-phase synchronizing condition which resulted in the failure of a 725 MVA GSU (generator step-up)…”
Get full text
Journal Article Conference Proceeding -
3
The Rockport plant-system planning considerations
Published in IEEE transactions on power systems (01-05-1988)“…Planning studies are reported which were carried out to determine the required EHV transmission facilities associated with the 2600 MW coal-fired Rockport…”
Get full text
Journal Article Conference Proceeding