Search Results - "Parmar, K.G."
-
1
ECRH experiments on Tokamaks SST-1 & Aditya-U and ECRH upgradation plan for SST-1
Published in EPJ Web of conferences (2023)“…A 42GHz-500kW ECRH system [1-6] is used to carry out various experiments related to plasma breakdown and ECR heating on tokamaks SST-1 and Aditya-U. The system…”
Get full text
Journal Article -
2
Development of fast steerable launcher for ECRH system
Published in Fusion engineering and design (01-08-2022)“…•A new ECRH launcher has been developed for the ECRH system capable of steering EC beam in poloidal and toroidal directions.•The poloidal steering is fast and…”
Get full text
Journal Article -
3
Upgradation of 82.6GHz ECRH system for SST-1 and Aditya-U
Published in EPJ Web of conferences (2024)“…In SST-1 and Aditya-U Tokamaks, two ECRH systems (42GHz-500kW and 82.6GHz-200k) are used to carry out various experiments related to ECRH assisted plasma…”
Get full text
Journal Article Conference Proceeding -
4
Commissioning of Electron Cyclotron Resonance Heating (ECRH) system on tokamak Aditya-U
Published in Fusion engineering and design (01-09-2019)“…•Tokamak Aditya is upgraded to tokamak Aditya-U.•42 GHz Electron Cyclotron Resonance Heating system on Tokamak Aditya-U.•Integration of Gyrotron and…”
Get full text
Journal Article -
5
Design and Development of DC Power Supply System for 1.5MW, 40MHz, RF Amplifier
Published in Conference Record of the 2006 Twenty-Seventh International Power Modulator Symposium (01-05-2006)“…A 1.5 MW RF (ap40 MHz) amplifier using Eima tetrode 4CM2500KG is in the testing phase, here at Institute for Plasma Research (IPR). This amplifier is being…”
Get full text
Conference Proceeding -
6
High Voltage and Auxiliary Power Supply System for 200kW CW Generator
Published in Conference Record of the 2006 Twenty-Seventh International Power Modulator Symposium (01-05-2006)“…The 200 kW generator is designed and developed for ion cyclotron resonant heating (ICRH) experiments on Aditya Tokamak and 1.5 MW stage for SST-1 (steady-state…”
Get full text
Conference Proceeding -
7
Steady state high power test system at 3.7 GHz
Published in Fusion engineering and design (01-10-2001)“…A Lower Hybrid Current Drive (LHCD) system would be the prime method to drive current in SST-1. The LHCD system is based upon two TH2103D klystrons of M/s…”
Get full text
Journal Article Conference Proceeding -
8
Anode modulator power supplies for continuous duty 500 kW klystrons (TH2103D) & 200 kW gyrotron (VGA8000A19)
Published in Proceedings of the 19th IEEE/IPSS Symposium on Fusion Engineering. 19th SOFE (Cat. No.02CH37231) (2002)“…Initial testing and commissioning of two high power klystrons (TH2103D) and gyrotron (VGA8000A19) have been carried out at our Institute. Each of the klystrons…”
Get full text
Conference Proceeding -
9
Results of 10-Joule wire-burn test performed on 70 kV rail-gap crowbar protection system for high power klystrons and gyrotron
Published in Proceedings of the 19th IEEE/IPSS Symposium on Fusion Engineering. 19th SOFE (Cat. No.02CH37231) (2002)“…Pulsed and continuous high power microwave tubes need to be protected against arc faults within the tube. If the energy dumped in such arc fault is more than…”
Get full text
Conference Proceeding -
10
Electron cyclotron resonance frequency system on tokamak Aditya
Published in Proceedings of the 19th IEEE/IPSS Symposium on Fusion Engineering. 19th SOFE (Cat. No.02CH37231) (2002)“…A 28 GHz ECRH system has been successfully commissioned on the tokamak Aditya to carry out breakdown, start up and heating experiments. The microwave source…”
Get full text
Conference Proceeding