Modeling and remediation of ground water contamination at the Engelse Werk wellfield
Contaminants have been threatening the Engelse Werk wellfield located between the town of Zwolle and the IJssel River in the Netherlands. Chemical analysis of water samples taken in production wells, both at the IJssel River and near the Zwolle railway station, indicated elevated concentrations of m...
Saved in:
Published in: | Ground water monitoring & remediation Vol. 18; no. 3; pp. 114 - 124 |
---|---|
Main Authors: | , , , |
Format: | Journal Article |
Language: | English |
Published: |
Oxford, UK
Blackwell Publishing Ltd
1998
|
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Contaminants have been threatening the Engelse Werk wellfield located between the town of Zwolle and the IJssel River in the Netherlands. Chemical analysis of water samples taken in production wells, both at the IJssel River and near the Zwolle railway station, indicated elevated concentrations of mainly organic contaminants including benzene, bentazon, acenaftene, trichloroethane, and bromacil. Immediate contaminant prevention and remediation measures are needed to safeguard the production wells. Ground water flow and transport models were developed to assist in the design of remediation strategies. Ground water flow models indicated that the IJssel River and a waste disposal ditch at the railway station are within the capture zone of the wellfield. A chloride transport model simulated minimum travel times in the order of four to 13 years for contaminants in the IJssel River to reach the production wells of the wellfield. A transport model for benzene was set up to advise on the remediation measures to be taken at the waste disposal ditch to clean up the contamination in the upper aquifer between this site and the Engelse Werk wellfield. The designed remediation system consists of 12 pumping wells with a combined capacity of 1650 m3/day. The system is capable of reducing the benzene levels at the threatened production wells at the Engelse Werk wellfield to a permissible level below 0.1 microgram/L within a period of 5 years |
---|---|
Bibliography: | 1997090510 T01 istex:E5C0EC84E5E32601149BFD5A38E6DF4168F93661 ark:/67375/WNG-JBVBJ2B1-L ArticleID:GWMR114 ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 23 ObjectType-Article-2 ObjectType-Feature-1 |
ISSN: | 1069-3629 1745-6592 |
DOI: | 10.1111/j.1745-6592.1998.tb00735.x |