Search Results - "Kuehn, Ingo"

  • Showing 1 - 8 results of 8
Refine Results
  1. 1

    Status of Plant Construction in ITER Tokamak Complex Buildings by Kuehn, Ingo, Beltran, David, Boe, Pascal De, Giuseppe, Giovanni Di, Fortunato, Federico, Gjoklaj, Armand, Jansen, Duco, Barbera, Claudio La, Marquez, Alfonso, Orlandi, Sergio, Roques, Bertrand, Terada, Seiji, Woods, Nick

    Published in IEEE transactions on plasma science (31-07-2024)
    “…The ITER Project is currently in its construction phase. All plant systems required for the first plasma phase, including captive components in the Tokamak…”
    Get full text
    Journal Article
  2. 2

    Management of the ITER Buildings Configuration for the Construction and Installation Phase by Kuehn, Ingo, Cordier, Jean-Jacques, Baylard, Christophe, Kotamaki, Miikka, Patisson, Laurent, Reich, Jens, Ring, William

    Published in IEEE transactions on plasma science (01-01-2018)
    “…The ITER project consists of a wide range of complex systems and interfaces which needs to be configured and controlled over the lifetime of the project with a…”
    Get full text
    Journal Article
  3. 3

    Status on Design and Construction of the ITER Buildings and Plant Systems by Kuehn, Ingo, Cordier, Jean-Jacques, Carafa, Leontin, Darbour, Romaric, Giuseppe, Giovanni Di, Jeannoutot, Thomas, Kotamaki, Miikka, Patisson, Laurent, Perrin, Jean Lou, Rigoni, Giuliano, Rotella, Rossella, Vannuffelen, Fabrice, Vincent, Gregoire, Zhang, Yanhong

    Published in IEEE transactions on plasma science (01-07-2018)
    “…The Tokamak complex building construction is progressing on the ITER site. This consists of the Tokamak building hosting the machine, the Tritium building and…”
    Get full text
    Journal Article
  4. 4
  5. 5

    CODAC systems arrangement and connectivity by Gulati, Hitesh Kumar, Beltran, David, Kuehn, Ingo, Kotamaki, Miikka, Makijarvi, Petri, Wallander, Anders

    Published in Fusion engineering and design (01-10-2013)
    “…•The CODAC system is a distributed system and scattered in many buildings connected with cables. Building construction for ITER project is just started so…”
    Get full text
    Journal Article
  6. 6

    Lessons learned from implementation of system maturity evaluation: a global and integrated approach to design maturity by Baylard, Christophe, Kuehn, Ingo, Orlandi, Sergio, Chiocchio, Stefano, Lioce, Donato, Olcese, Marco

    “…The main idea of the presented approach consists in looking at ITER more as a global integrated system and less as a set of components. In addition to the…”
    Get full text
    Conference Proceeding
  7. 7

    Management of the ITER buildings configuration for the construction and installation phase by Kuehn, Ingo, Cordier, Jean-Jacques, Baylard, Christophe, Kotamaki, Miikka, Patisson, Laurent, Reich, Jens, Ring, William

    “…The ITER project consists of a wide range of complex systems and interfaces which needs to be configured and controlled over the lifetime of the project with a…”
    Get full text
    Conference Proceeding
  8. 8

    Development on systems configuration in ITER Tokamak Complex and Auxiliary Buildings by Kuehn, Ingo, Kotamaki, Miikka, Schmieder, Laurent, Cordier, Jean-Jacques, Chiocchio, Stefano, Carafa, Leontin, Klingsmith, James, Patisson, Laurent, Rigoni, Giuliano, Tsedri, Thibault

    Published in Fusion engineering and design (01-10-2011)
    “…The ITER site consists of almost 30 buildings to service the Tokamak machine which is located in the centre of the Tokamak Complex facility with the Tokamak-,…”
    Get full text
    Journal Article Conference Proceeding