Search Results - "Koval, D.O."

Refine Results
  1. 1

    Reliability modeling of distributed generation in conventional distribution systems planning and analysis by Chowdhury, A.A., Agarwal, S.K., Koval, D.O.

    Published in IEEE transactions on industry applications (01-09-2003)
    “…The primary objective of any electric utility company in the new competitive environment would be to increase the market value of the services it provides with…”
    Get full text
    Journal Article
  2. 2

    Development of probabilistic models for computing optimal distribution substation spare transformers by Chowdhury, A.A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-11-2005)
    “…This paper presents probabilistic models developed based on the Poisson probability distribution for determining the optimal number of transformer spares for…”
    Get full text
    Journal Article
  3. 3

    Current practices and customer value-based distribution system reliability planning by Chowdhury, A.A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-09-2004)
    “…Among the major issues facing utilities in today's competitive electricity market is the pressure to hold the line on rates and provide electricity with…”
    Get full text
    Journal Article
  4. 4

    System Reliability Worth Assessment Using the Customer Survey Approach by Chowdhury, A.A., Mielnik, T.C., Lawton, L.E., Sullivan, M.J., Katz, A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-01-2009)
    “…A very popular method utilized in quantifying the benefit of power delivery service reliability is to estimate the customer monetary losses associated with…”
    Get full text
    Journal Article
  5. 5

    Reliability Assessment of a Backup Gas Turbine Generation System for a Critical Industry Load Using a Monte Carlo Simulation Model by Chowdhury, A.A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-01-2009)
    “…The Alberta Interconnected Electric System (AIES) forms a single integrated transmission network serving the Province of Alberta, Canada. A number of large…”
    Get full text
    Journal Article
  6. 6

    Application of customer interruption costs in transmission network reliability planning by Chowdhury, A.A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-11-2001)
    “…A method that can be utilized to ascertain the optimum level of power supply reliability is used to compare the incremental cost of providing reliability with…”
    Get full text
    Journal Article
  7. 7

    An Update on the Spreadsheet Electrical Reliability Model by Propst, J.E., Koval, D.O., Zhenfu Dong

    Published in IEEE transactions on industry applications (01-05-2009)
    “…Over the past 12 years, a number of changes and enhancements have been made to the Spreadsheet Electrical Reliability Model that was introduced at the 1994…”
    Get full text
    Journal Article
  8. 8

    Zone-branch reliability methodology for analyzing industrial power systems by Koval, D.O.

    Published in IEEE transactions on industry applications (01-09-2000)
    “…There are many methods available for evaluating the frequency and duration of load point interruptions within a given industrial power system configuration. As…”
    Get full text
    Journal Article
  9. 9

    Impact of circuit breaker failure modes on the reliability of the gold book standard network by Dong, J., Koval, D.O., Zuo, M.J.

    Published in IEEE transactions on industry applications (01-09-2005)
    “…The failure modes of circuit breakers have a significant impact on individual load point reliability levels of industrial power systems. This paper presents…”
    Get full text
    Journal Article
  10. 10

    Reliability of various industrial substations by Zhenfu Dong, Koval, D.O., Propst, J.E.

    Published in IEEE transactions on industry applications (01-07-2004)
    “…Many utility and industrial substation configurations have been designed to interconnect energy sources and individual industrial load points. The design,…”
    Get full text
    Journal Article
  11. 11

    Value-based distribution system reliability planning by Chowdhury, A.A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-01-1998)
    “…Society is becoming increasingly dependent on a cost-effective reliable electric power supply. Unreliable electric power supplies can be extremely costly to…”
    Get full text
    Journal Article
  12. 12

    Canadian national power quality survey: frequency and duration of voltage sags and surges at industrial sites by Koval, D.O., Bocancea, R.A., Kai Yao, Hughes, M.B.

    Published in IEEE transactions on industry applications (01-09-1998)
    “…The occurrence of voltage sags and surges originating on the primary and secondary sides of industrial facilities can disrupt continuous and noncontinuous…”
    Get full text
    Journal Article
  13. 13

    Canadian National Power Quality Survey: frequency of industrial and commercial voltage sags by Koval, D.O., Hughes, M.B.

    Published in IEEE transactions on industry applications (01-05-1997)
    “…In 1991, the Canadian Electrical Association (CEA) took a proactive approach to power quality problems and initiated a three-year "Canadian National Power…”
    Get full text
    Journal Article
  14. 14

    Value-based power system reliability planning by Chowdhury, A.A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-03-1999)
    “…In a competitive energy market, in which power supply reliability can influence customer purchasing decisions, electric utilities throughout the world are…”
    Get full text
    Journal Article
  15. 15

    Impact of manual versus automatic transfer switching on the reliability levels of an industrial plant by Khan, I.K., Jiechun Zheng, Koval, D.O., Dinavahi, V.

    Published in IEEE transactions on industry applications (01-09-2005)
    “…Detailed reliability modeling and analysis of industrial plants provides an estimate of the frequency and duration of load point interruptions. The duration of…”
    Get full text
    Journal Article
  16. 16

    Deregulated transmission system reliability planning criteria based on historical equipment performance data by Chowdhury, A.A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-01-2001)
    “…In the past, electric utilities were continuously adding more facilities to their systems in order to satisfy the growing customer energy requirements. A…”
    Get full text
    Journal Article
  17. 17

    Discussion of "Application of customer interruption costs in transmission network reliability planning" [and closure] by Shih-Min Hsu, Chowdhury, A.A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-09-2002)
    “…Shih-Min Hsu comments on the paper by A. A. Chowdhury et al. (see ibid., vol.37, p.1590-6, 2001). He comments on transmission systems reliability and the use…”
    Get full text
    Journal Article
  18. 18
  19. 19

    Zone-branch reliability methodology applied to Gold Book standard network by Koval, D.O., Liang Jiao, Arno, R.G., Hale, P.S.

    Published in IEEE transactions on industry applications (01-07-2002)
    “…There is a need recognized in the power industry to identify and utilize a standard tool or a set of tools to analyze the reliability of industrial and…”
    Get full text
    Journal Article
  20. 20

    Development of transmission system reliability performance benchmarks by Chowdhury, A.A., Koval, D.O.

    Published in IEEE transactions on industry applications (01-05-2000)
    “…The reliability of an electric utility transmission system is a measure of its ability to continuously meet the demands of all its customers (i.e., points of…”
    Get full text
    Journal Article