Search Results - "Knust, S."

Refine Results
  1. 1

    Spray pyrolysis of thin adhesion-promoting ZnO films on ZnMgAl coated steel by Grothe, R., Knust, S., Meinderink, D., Voigt, M., Orive, A. González, Grundmeier, G.

    Published in Surface & coatings technology (25-07-2020)
    “…The presented work focuses on the effect of the deposition of zinc oxide layers by means of spray pyrolysis on the electrochemical and adhesive properties of…”
    Get full text
    Journal Article
  2. 2

    Shop scheduling problems with pliable jobs by Knust, S., Shakhlevich, N. V., Waldherr, S., Weiß, C.

    Published in Journal of scheduling (01-12-2019)
    “…In this paper, we study a new type of flow shop and open shop models, which handle so-called “pliable” jobs: their total processing times are given, but…”
    Get full text
    Journal Article
  3. 3

    Open Shop Scheduling with Synchronization by Weiß, C., Waldherr, S., Knust, S., Shakhlevich, N. V.

    Published in Journal of scheduling (01-12-2017)
    “…In this paper, we study open shop scheduling problems with synchronization. This model has the same features as the classical open shop model, where each of…”
    Get full text
    Journal Article
  4. 4

    A search for magnetic resonance of ruthenium in octahedral coordination with oxygen by Blackstead, H.A., Yelon, W.B., Kornecki, M., Smylie, M.P., McGinn, P.J., Cai, Q., Benapfl, B.W., Knust, S.D.

    “…We have searched, without success, for microwave-frequency magnetic resonance of Ru 4+ and Ru 5+ ions in a number of materials for which the Ru are in…”
    Get full text
    Journal Article
  5. 5

    Evaluating the discrimination of Cu-mineralized rock alteration products from simulated MAPSAR Images in the Curaçá Valley, Brazil by Rabelo, T. N., Paradella, W. R., Santos, A. R., Rennó, C. D., Galvão, L. S., Mura, J. C., Knust, S. S. A.

    Published in International journal of remote sensing (20-10-2007)
    “…L-band images simulating MAPSAR satellite sensor data were used to identify Cu-mineralized rock alteration products in the Curaçá Valley, Brazil. The area is…”
    Get full text
    Journal Article
  6. 6
  7. 7

    Tabu search algorithms for job-shop problems with a single transport robot by Hurink, Johann, Knust, Sigrid

    Published in European journal of operational research (01-04-2005)
    “…We consider a generalized job-shop problem where the jobs additionally have to be transported between the machines by a single transport robot. Besides…”
    Get full text
    Journal Article
  8. 8

    The assignment problem with nearly Monge arrays and incompatible partner indices by Weiß, C., Knust, S., Shakhlevich, N.V., Waldherr, S.

    Published in Discrete Applied Mathematics (01-10-2016)
    “…In this paper we study the d-dimensional assignment problem in which entries of the cost array satisfy the Monge property, except for ∞-entries, which may…”
    Get full text
    Journal Article
  9. 9

    A linear programming and constraint propagation-based lower bound for the RCPSP by Brucker, Peter, Knust, Sigrid

    Published in European journal of operational research (01-12-2000)
    “…A new destructive lower bound for the resource-constrained project scheduling problem (RCPSP) is presented. Given are n activities which have to be processed…”
    Get full text
    Journal Article
  10. 10

    Lower bounds for resource-constrained project scheduling problems by Brucker, Peter, Knust, Sigrid

    Published in European journal of operational research (01-09-2003)
    “…A destructive lower bound for the multi-mode resource-constrained project scheduling problem with minimal and maximal time-lags is presented. Given are n…”
    Get full text
    Journal Article
  11. 11

    A branch and bound algorithm for the resource-constrained project scheduling problem by Brucker, Peter, Knust, Sigrid, Schoo, Arno, Thiele, Olaf

    Published in European journal of operational research (01-06-1998)
    “…A branch and bound algorithm is presented for the resource-constrained project scheduling problem (RCPSP). Given are n activities which have to be processed…”
    Get full text
    Journal Article Conference Proceeding
  12. 12

    Makespan minimization for flow-shop problems with transportation times and a single robot by Hurink, Johann, Knust, Sigrid

    Published in Discrete Applied Mathematics (15-09-2001)
    “…In a flow-shop problem with transportation times and a single robot n jobs consisting of m operations have to be processed in the same order on m machines…”
    Get full text
    Journal Article Conference Proceeding
  13. 13

    Complexity results for flow-shop problems with a single server by Brucker, Peter, Knust, Sigrid, Wang, Guoqing

    Published in European journal of operational research (01-09-2005)
    “…Flow-shop problems with a single server are generalizations of classical flow-shop problems. Immediately before processing, each operation must be loaded onto…”
    Get full text
    Journal Article Conference Proceeding
  14. 14

    A tabu search algorithm for scheduling a single robot in a job-shop environment by Hurink, Johann, Knust, Sigrid

    Published in Discrete Applied Mathematics (15-06-2002)
    “…We consider a single-machine scheduling problem which arises as a subproblem in a job-shop environment where the jobs have to be transported between the…”
    Get full text
    Journal Article
  15. 15

    List scheduling in a parallel machine environment with precedence constraints and setup times by Hurink, Johann, Knust, Sigrid

    Published in Operations research letters (01-12-2001)
    “…We present complexity results which have influence on the strength of list scheduling in a parallel machine environment where additional precedence constraints…”
    Get full text
    Journal Article
  16. 16

    Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation Delays by Brucker, Peter, Knust, Sigrid, Cheng, T.C. Edwin, Shakhlevich, Natalia V.

    Published in Annals of operations research (01-07-2004)
    “…We consider shop problems with transportation delays where not only the jobs on the machines have to be scheduled, but also transportation of the jobs between…”
    Get full text
    Journal Article
  17. 17
  18. 18

    Lower bounds for scheduling a single robot in a job-shop environment by Brucker, Peter, Knust, Sigrid

    Published in Annals of operations research (01-09-2002)
    “…We consider a single-machine scheduling problem which arises as a subproblem in a job-shop environment where the jobs have to be transported between the…”
    Get full text
    Journal Article
  19. 19

    Scheduling chains with identical jobs and constant delays on a single machine by Brucker, Peter, Knust, Sigrid, Oğuz, Ceyda

    “…In this paper we study the single-machine problem 1|chains(l), pj=p|SUMCj in which jobs with constant processing times and generalized precedence constraints…”
    Get full text
    Journal Article
  20. 20