Search Results - "Kamikubota, N"

  • Showing 1 - 16 results of 16
Refine Results
  1. 1

    Trigger-timing signal distribution system for the KEK electron/positron injector linac by Suwada, T, Furukawa, K, Kamikubota, N, Satoh, M

    “…The KEK electron/positron injector linac provides a short-pulse electron beam with an energy of 2.5 GeV for the Photon Factory (PF) storage ring, that with an…”
    Get full text
    Journal Article
  2. 2

    Stripline-type beam-position-monitor system for single-bunch electron/positron beams by Suwada, T, Kamikubota, N, Fukuma, H, Akasaka, N, Kobayashi, H

    “…About 90 stripline-type beam-position monitors have been newly installed in the KEKB injector linac. These monitors easily reinforce the handling of beam…”
    Get full text
    Journal Article
  3. 3
  4. 4

    New data acquisition system for beam loss monitor used in J-PARC main ring by Satou, K., Toyama, T., Kamikubota, N., Yoshida, S., Matsushita, J., Wakita, T., Sugiyama, M., Morino, T.

    “…A new data acquisition system has been developed continually as a part of the development of a new beam loss monitor (BLM) system for the J-PARC main ring…”
    Get full text
    Journal Article
  5. 5
  6. 6
  7. 7

    Beam position monitor and its calibration in J-PARC LINAC by Sato, S., Tomisawa, T., Sako, H., Shen, G., Ueno, A., Akikawa, H., Igarashi, Z., Lee, S., Ikegami, M., Kamikubota, N.

    “…The beam commissioning of J-PARC LINAC has been started in November 2006. Beam position monitors (BPMs) which had been calibrated on the bench setup with a…”
    Get full text
    Conference Proceeding
  8. 8

    Developments of the Calibation Tools for Beam Position Monitor at J-PARC Linac by Sato, S., Tomisawa, T., Akikawa, H., Ueno, A., Lee, S., Igarashi, Z., Ikegami, M., Toyama, T., Kamikubota, N.

    “…In the J-PARC LINAC, there are mainly two requirements for calibration of beam position monitors (BPMs). One is that BPMs need to be calibrated with the…”
    Get full text
    Conference Proceeding
  9. 9

    Present Status of the J-PARC Control System by Katoh, T., Furukawa, K., Kamikubota, N., Nakagawa, H., Odagiri, J., Shen, G., Takeuchi, N., Yamamoto, N., Yoshii, M., Sakaki, H., Sako, H., Takahashi, H., Tamura, F., Yoshikawa, H.

    “…The present status of the design and construction of the control system for Japan Proton Accelerator Research Complex (J-PARC) is given. J-PARC is a 3-stage…”
    Get full text
    Conference Proceeding
  10. 10

    Introduction of Modern Subsystems at the KEK Injector-linac by Kamikubota, N, Furukawa, K, Kusano, S, Obata, T

    Published 13-12-2001
    “…eConf C011127 (2001) WEAP025 As an accelerator control system survives over several years, it is often the case that new subsystems are introduced into the…”
    Get full text
    Journal Article
  11. 11

    Beam Feedback Systems and BPM Read-out System for the Two-Bunch Acceleration at Kekb Linac by Furukawa, K, Kamikubota, N, Suwada, T, Obata, T

    Published 26-11-2001
    “…eConf C011127:WECT006,2001 In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in…”
    Get full text
    Journal Article
  12. 12

    Implementation of the Epics Device Support for Network-Based Controllers by Furukawa, K, Chiba, J, Kamikubota, N, Nakagawa, H

    Published 26-11-2001
    “…eConf C011127 (2001) TUAP066 In the control system of the JAERI-KEK joint project (High Intensity Proton Accelerator Facility), it is planned to employ…”
    Get full text
    Journal Article
  13. 13

    A Control System of the Joint-Project Accelerator Complex by Chiba, J, Fujii, H, Furukawa, K, Kamikubota, N, Nakagawa, H, Yamamoto, N, Sakaki, H, Yoshikawa, H

    Published 28-11-2001
    “…eConf C011127 (2001) TUAP002 The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented…”
    Get full text
    Journal Article
  14. 14

    Beam Switching and Beam Feedback Systems at KEKB Linac by Furukawa, K, Enomoto, A, Kamikubota, N, Kamitani, T, Matsumoto, T, Ogawa, Y, Ohsawa, S, Oide, K, Suwada, T

    Published 18-08-2000
    “…eConf C000821 (2000) TUE10 The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings,…”
    Get full text
    Journal Article
  15. 15

    Increase of positrons by a high-intensity two-bunch acceleration scheme at the KEKB linac by Ohsawa, S., Enomoto, A., Kikutani, E., Furukawa, K., Iida, N., Ikeda, M., Kamikubota, N., Kamitani, T., Kobayashi, H., Koiso, H., Matsumoto, T., Ogawa, Y., Ohnishi, Y., Oide, K., Suwada, T.

    “…As the accumulation current of positrons increases in the KEKB ring, the injection time is becoming longer. It will thus be one of the most important issues…”
    Get full text
    Conference Proceeding
  16. 16

    New pre-injector of the KEK 2.5-GeV linac and its performance by Ohsawa, S., Abe, I., Anami, S., Ghoi, J.-Y., Enomoto, A., Furukawa, K., Nanaki, H., Kakihara, K., Kamikubota, N., Kamitani, T., Kobayashi, H., Ogawa, Y., Oogoe, T., Sato, I., Suwada, T., Yamazaki, Y., Yokota, M., Asami, A.

    “…The injection system (pre-injector) of the KEK 2.5-GeV linac has been upgraded so that we can investigate intense beam acceleration for the KEK B-factory…”
    Get full text
    Conference Proceeding