Search Results - "Hyoun-seok Moon"

  • Showing 1 - 10 results of 10
Refine Results
  1. 1

    Development of a 4D object-based system for visualizing the risk information of construction projects by Kang, Leen Seok, Kim, Sung-Keun, Moon, Hyoun Seok, Kim, Hyeon Seung

    Published in Automation in construction (01-05-2013)
    “…Recently, risks in construction projects have been gradually increasing due to the upsizing of construction projects and the introduction of diverse new…”
    Get full text
    Journal Article
  2. 2

    Development of methodology and virtual system for optimised simulation of road design data by Kang, Leen Seok, Moon, Hyoun Seok, Dawood, Nashwan, Kang, Min Su

    Published in Automation in construction (01-12-2010)
    “…Current virtual reality (VR) and augmented reality (AR) tools do not lend themselves well to the simulation of non-repetitive activities that could be involved…”
    Get full text
    Journal Article
  3. 3

    Developing an active resource allocation algorithm considering resource supply and demand in a construction site by Kang, Leen-Seok, Moon, Hyoun-Seok, Min, Chang-Hoon, Kim, Sung-Keun, Kim, Hyeon Seung

    Published in KSCE journal of civil engineering (01-01-2015)
    “…Large and complex construction projects require a timely supply of resources to reduce the construction time as well as prepare a construction plan that…”
    Get full text
    Journal Article
  4. 4

    Improved link system between schedule data and 3D object in 4D CAD system by using WBS code by Kang, Leen-Seok, Moon, Hyoun-Seok, Park, Seo-Young, Kim, Chang-Hak, Lee, Tai Sik

    Published in KSCE journal of civil engineering (01-11-2010)
    “…Current 4D CAD systems can perform basic functions to construct a 4D simulation to visualize a construction schedule. One important function is to link the…”
    Get full text
    Journal Article
  5. 5

    An Automated 3D Model Generation Framework for Construction Equipment Images using Edge Detection Algorithm by Lee, Jae-Kun, Lee, Hye-Min, Moon, Hyoun-Seok

    “…Recently, the interest in construction equipment simulation has increased, and thus the necessity for rapid generation of 3D BIM construction equipment library…”
    Get full text
    Conference Proceeding
  6. 6

    Improvement of Link Process in 4D CAD Viewer by Using Interface Board for Construction Project Management by Kang Leen Seok, Kim Hyoun Seong, Moon Hyoun Seok, Kim Chang Hak

    “…Interference check process in construction schedule management is being one of important items as well as traditional scheduling analysis in project…”
    Get full text
    Conference Proceeding
  7. 7

    Application of VR Technology Linked with 4D CAD System for Construction Project by Leen-Seok Kang, Hyoun-Seok Moon, Seo-Young Park, Hyoun-Seong Kim, Chang-Hak Kim

    “…4D CAD system is a simulation tool for visualizing the finished appearance of construction facility by construction schedule. That is, project manager can…”
    Get full text
    Conference Proceeding
  8. 8

    Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation by Kang, Leen Seok, Kim, Hyeon Seung, Moon, Hyoun Seok, Kim, Sung-Keun

    Published in Automation in construction (01-08-2016)
    “…In recent years, the increased utilization of building information modeling (BIM) has brought attention to the need for BIM-based operation systems that…”
    Get full text
    Journal Article
  9. 9

    Application of augmented reality object in construction project by Hyeon-seung Kim, So-yeong Moon, Chang-hak Kim, Young-hwan Kim, Hyoun-seok Moon, Leen-seok Kang

    “…Because a construction project is being larger in size and complicated in structure, to be a successful construction project, various information technologies…”
    Get full text
    Conference Proceeding
  10. 10

    Visualizing Work Progress Information of Construction Project by Web and VR Application by Leen-Seok Kang, Hyoun-Seok Moon, Hyun-Seoung Kim, Gwang-Ryul Choi, Nam-Jin Park, Chang-Hak Kim

    Published in 2011 Fifth Asia Modelling Symposium (01-05-2011)
    “…The demand for visualizing schedule management information of construction work, which used to be comprised of numerical data is increasing by the web…”
    Get full text
    Conference Proceeding