Search Results - "Hazır, Öncü"

Refine Results
  1. 1

    A classification and review of approaches and methods for modeling uncertainty in projects by Hazır, Öncü, Ulusoy, Gündüz

    “…In this paper, we created a classification for major sources of uncertainty in projects and categorized the studies in project scheduling literature with…”
    Get full text
    Journal Article
  2. 2

    A risk-averse distributionally robust project scheduling model to address payment delays by Bruni, Maria Elena, Hazır, Öncü

    Published in European journal of operational research (01-10-2024)
    “…Delays in payments have become a common risk factor for industrial projects, especially in recent years, since the financial position of firms has been…”
    Get full text
    Journal Article
  3. 3

    A review of analytical models, approaches and decision support tools in project monitoring and control by Hazır, Öncü

    “…This paper reviews the problems, approaches and analytical models on project control systems and discusses the possible research extensions. We focused on…”
    Get full text
    Journal Article
  4. 4

    Assembly line balancing under uncertainty: Robust optimization models and exact solution method by Hazır, Öncü, Dolgui, Alexandre

    Published in Computers & industrial engineering (01-06-2013)
    “…•A robust optimization approach for assembly line balancing is presented.•Mathematical models for interval uncertainty of operation times are…”
    Get full text
    Journal Article
  5. 5

    Game theory-based models in green supply chain management: a review of the literature by Agi, Maher A. N., Faramarzi-Oghani, Sohrab, Hazır, Öncü

    “…This paper provides a systematic review and analysis of the game-theroy-based research in Green Supply Chains Management (GSCM). Based on a rigorous content…”
    Get full text
    Journal Article
  6. 6

    A Review of the Use of Game Theory in Project Management by Narbaev, Timur, Hazır, Öncü, Agi, Maher

    Published in Journal of management in engineering (01-11-2022)
    “…AbstractThe growing literature on game theory models in project management is reviewed in this paper. A systematic study that includes collecting materials,…”
    Get full text
    Journal Article
  7. 7

    A decomposition based solution algorithm for U-type assembly line balancing with interval data by Hazır, Öncü, Dolgui, Alexandre

    Published in Computers & operations research (01-07-2015)
    “…Balancing U-type assembly lines under uncertainty is addressed in this paper by formulating a robust problem and developing its optimization model and…”
    Get full text
    Journal Article
  8. 8

    An efficient branch and bound algorithm for smoothing the workloads on simple assembly lines by Hazır, Öncü, Agi, Maher A. N., Guérin, Jérémy

    “…In this study, we develop a branch and bound solution algorithm to solve the workload smoothing problem. Our algorithm incorporates new formulas for…”
    Get full text
    Journal Article
  9. 9

    Formulation and solution of an optimal control problem for industrial project control by Schmidt, Klaus Werner, Hazır, Öncü

    Published in Annals of operations research (01-09-2019)
    “…In this paper, we consider the monitoring and control of industrial projects that are performed by executing different activities within a given time duration…”
    Get full text
    Journal Article
  10. 10

    A review of cost and profit oriented line design and balancing problems and solution approaches by Hazır, Öncü, Delorme, Xavier, Dolgui, Alexandre

    Published in Annual reviews in control (01-01-2015)
    “…This review paper presents the state of the art on the problems, approaches and analytical models for assembly and transfer line design and balancing that…”
    Get full text
    Journal Article
  11. 11

    A fast and effective heuristic for smoothing workloads on assembly lines: algorithm design and experimental analysis by Hazır, Öncü, Agi, Maher A.N., Guérin, Jérémy

    Published in Computers & operations research (01-03-2020)
    “…•We develop an effective heuristic to solve the workload smoothing problem.•We integrate a problem specific decision-making rule.•We conduct an experimental…”
    Get full text
    Journal Article
  12. 12

    Robust optimization models for the discrete time/cost trade-off problem by Hazır, Öncü, Erel, Erdal, Günalay, Yavuz

    “…Developing models and algorithms to generate robust project schedules that are less sensitive to disturbances are essential in today's highly competitive…”
    Get full text
    Journal Article
  13. 13

    Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version by Hazır, Öncü, Haouari, Mohamed, Erel, Erdal

    Published in Computers & operations research (01-04-2010)
    “…This paper investigates the budget variant of the discrete time/cost trade-off problem (DTCTP). This multi-mode project scheduling problem requires assigning…”
    Get full text
    Journal Article
  14. 14

    Batch sizing and just-in-time scheduling with common due date by Hazir, Oencue, Kedad-Sidhoum, Safia

    Published in Annals of operations research (01-02-2014)
    “…In this paper, we address the optimal batch sizing and just-in-time scheduling problem where upper and lower bounds on the size of the batches are imposed. The…”
    Get full text
    Journal Article
  15. 15

    Big Data Adoption in Project Management: Insights From French Organizations by Bakici, Tuba, Nemeh, Andre, Hazir, Oncu

    “…Big data have the potential to revolutionize the project management, but it is not clear how. Despite the growing interest, there is a paucity of exploratory…”
    Get full text
    Journal Article
  16. 16

    Completing Projects on Time and Budget: A Study on the Analysis of Project Monitoring Practices Using Real Data by Kose, Tekin, Bakici, Tuba, Hazir, Oncu

    “…This article analyzes the relationship between project cost and time performance indicators and monitoring activities, namely, tracking frequency and…”
    Get full text
    Journal Article
  17. 17

    An integrated scheduling and control model for multi-mode projects by Hazır, Öncü, Schmidt, Klaus Werner

    “…In today’s highly competitive uncertain project environments, it is of crucial importance to develop analytical models and algorithms to schedule and control…”
    Get full text
    Journal Article
  18. 18

    A machine learning study to improve the reliability of project cost estimates by Narbaev, Timur, Hazir, Öncü, Khamitova, Balzhan, Talgat, Sayazhan

    “…Project managers need reliable predictive analytics tools to make effective project intervention decisions throughout the project life cycle. This study uses…”
    Get full text
    Journal Article
  19. 19

    Customer order scheduling problem: a comparative metaheuristics study by Hazır, Öncü, Günalay, Yavuz, Erel, Erdal

    “…The customer order scheduling problem (COSP) is defined as to determine the sequence of tasks to satisfy the demand of customers who order several types of…”
    Get full text
    Journal Article
  20. 20

    Integrated batch sizing and scheduling on a single machine by Chretienne, Philippe, Hazir, Oencue, Kedad-Sidhoum, Safia

    Published in Journal of scheduling (01-12-2011)
    “…In this paper, we address the integrated batch sizing and scheduling problem. We consider a single machine which can handle at most one customer order at a…”
    Get full text
    Journal Article