Search Results - "Guan, Zailin"

Refine Results
  1. 1

    A multi-objective fuzzy flexible job shop scheduling problem considering the maximization of processing quality by Li, Jiarui, Guan, Zailin

    “…This paper analyzes practical production characteristics, including customer's stringent quality requirements and uncertain processing time in aircraft shaft…”
    Get full text
    Journal Article
  2. 2

    An efficient production planning approach based demand driven MRP under resource constraints by Xu, Guangyan, Guan, Zailin, Yue, Lei, Mumtaz, Jabir

    “…Production plans based on Material Requirement Planning (MRP) frequently fall short in reflecting actual customer demand and coping with demand fluctuations,…”
    Get full text
    Journal Article
  3. 3

    An effective hybrid algorithm for multi-objective flexible job-shop scheduling problem by Huang, Xiabao, Guan, Zailin, Yang, Lixi

    Published in Advances in mechanical engineering (01-09-2018)
    “…Genetic algorithm is one of primary algorithms extensively used to address the multi-objective flexible job-shop scheduling problem. However, genetic algorithm…”
    Get full text
    Journal Article
  4. 4

    Multi-fidelity simulation optimization for production releasing in re-entrant mixed-flow shops by Zhang, Zhengmin, Guan, Zailin, Yue, Lei

    “…This research focuses on production releasing and routing allocation problems in re-entrant mixed-flow shops. Since re-entrant mixed flow shops are complex and…”
    Get full text
    Journal Article
  5. 5

    Collaborative scheduling of machining-assembly in complex multiple parallel production lines environment considering kitting constraints by Xu, Guangyan, Guan, Zailin, Peng, Kai, Yue, Lei

    “…In multi-stage machining-assembly production, collaborative scheduling for multiple production lines can effectively improve the execution efficiency of…”
    Get full text
    Journal Article
  6. 6

    An Adaptive Search Algorithm for Multiplicity Dynamic Flexible Job Shop Scheduling with New Order Arrivals by Ding, Linshan, Guan, Zailin, Luo, Dan, Rauf, Mudassar, Fang, Weikang

    Published in Symmetry (Basel) (01-06-2024)
    “…In today’s customer-centric economy, the demand for personalized products has compelled corporations to develop manufacturing processes that are more flexible,…”
    Get full text
    Journal Article
  7. 7

    A very fast TS/SA algorithm for the job shop scheduling problem by Zhang, Chao Yong, Li, PeiGen, Rao, YunQing, Guan, ZaiLin

    Published in Computers & operations research (2008)
    “…The job shop scheduling problem (JSP) is one of the most notoriously intractable NP-complete optimization problems. Over the last 10–15 years, tabu search (TS)…”
    Get full text
    Journal Article
  8. 8

    Multi-Level Planning and Scheduling for Parallel PCB Assembly Lines Using Hybrid Spider Monkey Optimization Approach by Mumtaz, Jabir, Guan, Zailin, Yue, Lei, Wang, Zhengya, Ullah, Saif, Rauf, Mudassar

    Published in IEEE access (2019)
    “…Printed circuit board (PCB) assembly lines are significant to produce a variety of electronic products. PCB manufacturing industries tend to move towards…”
    Get full text
    Journal Article
  9. 9

    A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem by Zhang, ChaoYong, Li, PeiGen, Guan, ZaiLin, Rao, YunQing

    Published in Computers & operations research (01-11-2007)
    “…Tabu search (TS) algorithms are among the most effective approaches for solving the job shop scheduling problem (JSP) which is one of the most difficult…”
    Get full text
    Journal Article
  10. 10

    Bi-objective optimization of identical parallel machine scheduling with flexible maintenance and job release times by Chen, Yarong

    “…This paper investigates an identical parallel machine scheduling problem with flexible maintenance and job release times and attempts to optimize two…”
    Get full text
    Journal Article
  11. 11

    Integrated Planning and Scheduling of Multiple Manufacturing Projects Under Resource Constraints Using Raccoon Family Optimization Algorithm by Rauf, Mudassar, Guan, Zailin, Yue, Lei, Guo, Ziteng, Mumtaz, Jabir, Ullah, Saif

    Published in IEEE access (2020)
    “…Today's dynamic environment and increasing demand for highly customized products have significantly increased the number of companies operating in the project…”
    Get full text
    Journal Article
  12. 12

    Modeling and Optimization for Multi-Objective Nonidentical Parallel Machining Line Scheduling with a Jumping Process Operation Constraint by Xu, Guangyan, Guan, Zailin, Yue, Lei, Mumtaz, Jabir, Liang, Jun

    Published in Symmetry (Basel) (01-08-2021)
    “…This paper investigates the nonidentical parallel production line scheduling problem derived from an axle housing machining workshop of an axle manufacturer…”
    Get full text
    Journal Article
  13. 13

    Heterogeneous-vehicle distribution logistics planning for assembly line station materials with multiple time windows and multiple visits by Fang, Weikang, Guan, Zailin, Yue, Lei, Zhang, Zhengmin, Wang, Hao, Meng, Leilei

    “…Aiming at distribution logistics planning in green manufacturing, heterogeneous-vehicle vehicle routing problems are identified for the first time with…”
    Get full text
    Journal Article
  14. 14

    Single Machine Scheduling Problem With a Weight-Modifying-Activity to Minimize the Total Weighted Completion Time by Chen, Yarong, Guan, Zailin, Tsai, Ya-Chih, Chou, Fuh-Der

    Published in IEEE access (2022)
    “…The single-machine scheduling problem with a weight-modifying-activity (WMA) to minimize the total weighted completion time was initially addressed by Mosheiov…”
    Get full text
    Journal Article
  15. 15

    Multi-Objective Material Logistics Planning with Discrete Split Deliveries Using a Hybrid NSGA-II Algorithm by Fang, Weikang, Guan, Zailin, Su, Peiyue, Luo, Dan, Ding, Linshan, Yue, Lei

    Published in Mathematics (Basel) (01-08-2022)
    “…To schedule material supply intelligently and meet the production demand, studies concerning the material logistics planning problem are essential. In this…”
    Get full text
    Journal Article
  16. 16

    A Bottleneck Degree-Based Migrating Birds Optimization Algorithm for the PCB Production Scheduling by Cao, Jun, Guan, Zailin, Yue, Lei, Ullah, Saif, Sherwani, Rehan Ahmad Khan

    Published in IEEE access (2020)
    “…To address the printed circuit board shop scheduling problem, a dynamic based on multi-indicator bottleneck degree is proposed to formulate this complex…”
    Get full text
    Journal Article
  17. 17

    The Printed-Circuit-Board Electroplating Parallel-Tank Scheduling With Hoist and Group Constraints Using a Hybrid Guided Tabu Search Algorithm by Wang, Hao, Guan, Zailin, Zhang, Chaoyong, Yue, Lei, Luo, Dan, Ullah, Saif

    Published in IEEE access (2019)
    “…Current research investigates a parallel-tank scheduling problem with hoist and group constraints in printed-circuit-board (PCB) electroplating environment,…”
    Get full text
    Journal Article
  18. 18

    A survey on assembly lines and its types by SAIF, Ullah, GUAN, Zailin, WANG, Baoxi, MIRZA, Jahanzeb, HUANG, Shiyang

    Published in Frontiers of Mechanical Engineering (01-06-2014)
    “…Assembly lines are useful for mass production of standard as well as customized products. Line balancing is an important issue, in this regard an optimal or…”
    Get full text
    Journal Article
  19. 19

    Improved multi-fidelity simulation-based optimisation: application in a digital twin shop floor by Zhang, Zhengmin, Guan, Zailin, Gong, Yeming, Luo, Dan, Yue, Lei

    “…In recent years, the literature has paid considerable attention to digital twin technology for the implementation of Industry 4.0 and intelligent…”
    Get full text
    Journal Article
  20. 20

    Data-driven cloud simulation architecture for automated flexible production lines: application in real smart factories by Luo, Dan, Guan, Zailin, He, Cong, Gong, Yeming, Yue, Lei

    “…In recent years, more manufacturing enterprises are building automated flexible production lines (AFPLs) to satisfy the dynamic and diversified demand…”
    Get full text
    Journal Article