Search Results - "Gopalan, M.N"

Refine Results
  1. 1

    Multi-type Rework in Two-stage Production Systems by Gopalan, M.N, Kannan, S

    “…Incorporates the concept of quality control in the probabilistic analysis of two-stage production systems. Provides an integrated framework to consider…”
    Get full text
    Journal Article
  2. 2

    Probability of first passage analysis of a two-stage transfer-line production system with storage and rework by Gopalan, M.N., Kannan, S.

    Published in Microelectronics and reliability (1996)
    “…In this paper, we study some of the transient state characteristics of a two-stage transfer-line production system subject to an initial storage of unlimited…”
    Get full text
    Journal Article
  3. 3

    On the transient behaviour of an r-out-of-n:G system by Gopalan, M.N., Kumar, U.Dinesh

    Published in Microelectronics and reliability (1996)
    “…In this paper, an r-out-of- n:G system with a single repair facility is analysed in connection with the cost incurred per unit time. A mathematical model is…”
    Get full text
    Journal Article
  4. 4

    Analysis of an n-unit cold-standby system with general failure and repair time distributions by Gopalan, M.N, Dinesh Kumar, U

    “…Analyses an n-unit cold-standby system with a single repair facility under the assumption that the failure and repair times are arbitrarily distributed…”
    Get full text
    Journal Article
  5. 5

    On the Production Rate of a Merge Production System by Gopalan, M.N, Dinesh Kumar, U

    “…A merge production system which has parallel stations in the first stage followed by a single station in the second stage is analysed in connection with the…”
    Get full text
    Journal Article
  6. 6

    On the Utilization of a Split Production System by Gopalan, M.N, Dinesh Kumar, U

    “…Analyses a split production system which has a single station in the first stage followed by two parallel stations in the second stage, in connection with the…”
    Get full text
    Journal Article
  7. 7

    Diagnostic Studies in the Copper-coating Process: A Case Study by Reddy, P.B.S, Subash Babu, A, Gopalan, M.N

    “…Reviews a real-life investigation carried out on copper coating of CO⊂2 welding wire. The major quality problems were non-uniformity in coating thickness and…”
    Get full text
    Journal Article
  8. 8

    Cost-Benefit Analysis of a 1 out of n : G System with Variable Repair and Preventive Maintenance Rates by Gopalan, M.N, Nagarwalla, H.E

    “…The system studied in this article is a 1 out of n : G system with a single server. A unit is repaired when it fails and is also taken off for preventive…”
    Get full text
    Journal Article
  9. 9

    Multitype Rework in Twostage Production Systems by Gopalan, M.N., Kannan, S.

    “…Incorporates the concept of quality control in the probabilistic analysis of twostage production systems. Provides an integrated framework to consider…”
    Get full text
    Journal Article
  10. 10

    Analysis of an nunit coldstandby system with generalfailure and repair time distributions by Gopalan, M.N., Dinesh Kumar, U.

    “…Analyses an nunit coldstandby system with a single repair facility under the assumption that the failure and repair times are arbitrarily distributed. Develops…”
    Get full text
    Journal Article
  11. 11

    Expected number analysis of a two-server queueing network subject to inter-stage inspection and rework by Gopalan, M.N., Kannan, S.

    Published in Computers & operations research (01-11-1995)
    “…In this paper, an attempt has been made to incorporate the concept of rework in the probabilistic analysis of queueing systems. The paper provides an…”
    Get full text
    Journal Article
  12. 12

    Diagnostic Studies in the Coppercoating Process A Case Study by Reddy, P.B.S., Subash Babu, A., Gopalan, M.N.

    “…Reviews a reallife investigation carried out on copper coating of CO2 welding wire. The major quality problems were nonuniformity in coating thickness and…”
    Get full text
    Journal Article
  13. 13

    Cost analysis of a two unit repairable system subject to on-line preventive maintenance and/or repair by Gopalan, M.N., Bhanu, K.S.

    Published in Microelectronics and reliability (1995)
    “…The purpose of this paper is to carry out the cost analysis of a two-unit repairable system subject to on-line preventive maintenance(PM) and repair. The…”
    Get full text
    Journal Article
  14. 14

    CostBenefit Analysis of a 1 out of n G System with Variable Repair and Preventive Maintenance Rates by Gopalan, M.N., Nagarwalla, H.E.

    “…The system studied in this article is a 1 out of n G system with a single server. A unit is repaired when it fails and is also taken off for preventive…”
    Get full text
    Journal Article
  15. 15

    Probabilistic analysis of a n-unit cold-standby system with general failure and repair time distributions by Gopalan, M.N., Dinesh Kumar, U.

    Published in Microelectronics and reliability (01-05-1995)
    “…In this paper, a n-unit cold-standby system with a single repair facility is analysed under the assumption that the failure and repair times are arbitrarily…”
    Get full text
    Journal Article
  16. 16

    On the transient behaviour of a repairable system with a warm standby by Gopalan, M.N., Dinesh Kumar, U.

    Published in Microelectronics and reliability (01-04-1996)
    “…In this paper, a two-unit active standby system is analysed to evaluate various measures of system performance under the assumption that the failure and repair…”
    Get full text
    Journal Article
  17. 17

    Approximate analysis of n-unit cold-standby systems by Gopalan, M.N., Dinesh Kumar, U.

    Published in Microelectronics and reliability (01-04-1996)
    “…In this paper, a n-unit cold-standby system with a single repair facility is analysed using two approximate methods namely, cutting and clustering the state…”
    Get full text
    Journal Article
  18. 18

    On the utilization of a split production system with inter-stage inspection by Gopalan, M.N., Kumar, U.Dinesh

    “…In this paper, a split production system with two parallel stations in the second stage is analysed in connection with the utilization of the production…”
    Get full text
    Journal Article
  19. 19

    On the transient analysis of a maintained system subject to random stresses by Gopalan, M.N., Sadananda Rao, P.R.

    Published in Microelectronics and reliability (01-02-1996)
    “…This paper deals with the probablistic analysis of a system subject to stresses. The system consists of a basic unit and a standby and is provided with a…”
    Get full text
    Journal Article
  20. 20

    Analysis of consecutive k-out-of- n: F systems with single repair facility by Dinesh Kumar, U., Gopalan, M.N.

    Published in Microelectronics and reliability (1997)
    “…In this paper, a consecutive k-out-of- n:F system with non-identical units and with a single repair facility is analyzed in connection with the reliability and…”
    Get full text
    Journal Article