Search Results - "Goodrum, Paul M."

Refine Results
  1. 1

    Prioritization of Personal Protective Equipment Plans for Construction Projects Based on an Integrated Analytic Network Process and Fuzzy VIKOR Method by Jin, Haifeng, Goodrum, Paul M.

    Published in Applied sciences (01-11-2024)
    “…The risk of both fatal accidents and non-fatal injuries in the construction industry is significantly high in most countries. To reduce this construction…”
    Get full text
    Journal Article
  2. 2

    Integrated Decision Support Framework of Optimal Scaffolding System for Construction Projects by Jin, Haifeng, Goodrum, Paul M.

    Published in Algorithms (01-07-2023)
    “…Selecting the appropriate temporary facilities is important for reducing cost and improving the productivity and safety of craft professionals in construction…”
    Get full text
    Journal Article
  3. 3

    Optimal Fall Protection System Selection Using a Fuzzy Multi-Criteria Decision-Making Approach for Construction Sites by Jin, Haifeng, Goodrum, Paul M.

    Published in Applied sciences (01-06-2021)
    “…Construction falls are a leading cause of fatalities in almost every construction industry around the globe, and fall protection systems are the key measures…”
    Get full text
    Journal Article
  4. 4

    An analysis of construction productivity differences between Canada and the United States by Nasir, Hassan, Ahmed, Hani, Haas, Carl, Goodrum, Paul M.

    Published in Construction management and economics (03-06-2014)
    “…Comparisons of industry sectors in advanced economies since the 1960s show that the construction sector has lagged in productivity growth rates, especially in…”
    Get full text
    Journal Article
  5. 5

    Assessing the impact of materials tracking technologies on construction craft productivity by Grau, David, Caldas, Carlos H., Haas, Carl T., Goodrum, Paul M., Gong, Jie

    Published in Automation in construction (01-11-2009)
    “…Even though previous studies indicate that construction labor productivity can benefit from automated tracking technologies for field materials management…”
    Get full text
    Journal Article
  6. 6

    The application of active radio frequency identification technology for tool tracking on construction job sites by Goodrum, Paul M., McLaren, Matt A., Durfee, Adam

    Published in Automation in construction (01-05-2006)
    “…Tool availability is a critical factor in the productivity of construction crews. In an effort to improve the efficiency of tracking tools and improve their…”
    Get full text
    Journal Article
  7. 7

    Complexity, Performance, and Search Efficiency: An Eye-Tracking Study on Assembly-Based Tasks among Construction Workers (Pipefitters) by Al-Haddad, Sara, Sears, Matthew, Alruwaythi, Omar, Goodrum, Paul M.

    Published in Buildings (Basel) (01-12-2022)
    “…Past studies have used eye-tracking glasses to analyze people’s perception of visual stimuli, usually regarding wayfinding, safety, or visual appeal. Some…”
    Get full text
    Journal Article
  8. 8

    Applying the Tier II Construction Management Strategy to Measure the Competency Level among Single and Multiskilled Craft Professionals by Albalawi, Rakan K., Goodrum, Paul M., Taylor, Timothy R. B.

    Published in Buildings (Basel) (28-04-2023)
    “…Various contemporary studies have revealed a heightened need for the implementation of effective strategies to reduce labor shortages in the construction…”
    Get full text
    Journal Article
  9. 9

    Integration of Building Information Modeling and Critical Path Method Schedules to Simulate the Impact of Temperature and Humidity at the Project Level by Shan, Yongwei, Goodrum, Paul

    Published in Buildings (Basel) (01-09-2014)
    “…Steel construction activities are often undertaken in an environment with limited climate control. Both hot and cold temperatures can physically and…”
    Get full text
    Journal Article
  10. 10

    Identification of Best Practices in Project Bundling for State DOTs Using Semistructured Interviews by Shrestha, Saurav, Shan, Yongwei, Goodrum, Paul M.

    “…AbstractProject bundling is a method used by state Departments of Transportation (DOTs) and other public agencies to combine multiple construction projects…”
    Get full text
    Journal Article
  11. 11

    Impact of Skilled Labor Availability on Construction Project Cost Performance by Karimi, Hossein, Taylor, Timothy R. B, Dadi, Gabriel B, Goodrum, Paul M, Srinivasan, Cidambi

    “…AbstractThe North American construction industry began to experience a shortage of skilled labor in the 1980s, which has continued as a repetitive cyclic trend…”
    Get full text
    Journal Article
  12. 12

    Evolution of Multiskilled Craft Professionals and Their Level of Certification in the US Industrial Construction Sector by Albalawi, Rakan, Goodrum, Paul M., Albattah, Mohammed A.

    Published in Journal of management in engineering (01-01-2024)
    “…Over the past couple of decades, the US construction sector has experienced a nationwide shortage of skilled craft professionals in several trades. In response…”
    Get full text
    Journal Article
  13. 13

    Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance by Karimi, Hossein, Taylor, Timothy R. B., Goodrum, Paul M.

    Published in Construction management and economics (03-06-2017)
    “…The North American construction industry has experienced periods of craft shortages for decades. While this problem has received significant attention from…”
    Get full text
    Journal Article
  14. 14

    Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity by Dai, Jiukun, Goodrum, Paul M, Maloney, William F

    “…In efforts to quantify craft workers’ perspective of construction productivity, a nationwide survey involving 1,996 craft workers was employed. The survey…”
    Get full text
    Journal Article
  15. 15

    Influence of the Format of Engineering Information and Spatial Cognition on Craft-Worker Performance by Goodrum, Paul M, Miller, Jeffrey, Sweany, John, Alruwaythi, Omar

    “…AbstractA series of field trials with pipefitters in North America was conducted to explore how their spatial cognition influenced their performance on a scale…”
    Get full text
    Journal Article
  16. 16

    Young Talent Motivations to Pursue Craft Careers in Construction: The Theory of Planned Behavior by Minooei, Farzad, Goodrum, Paul M, Taylor, Timothy R. B

    “…AbstractPast studies indicate that the US construction industry is facing challenges to attract young talent to pursue craft careers. The main goal of this…”
    Get full text
    Journal Article
  17. 17

    Civil Integrated Management: Empirical study of digital practices in highway project delivery and asset management by Sankaran, Bharathwaj, Nevett, Guillermo, O'Brien, William J., Goodrum, Paul M., Johnson, Joshua

    Published in Automation in construction (01-03-2018)
    “…Principal technologies and practices contributing to the workflow of highway infrastructure projects are undergoing significant changes due to Civil Integrated…”
    Get full text
    Journal Article
  18. 18

    Multiobjective Optimization for Scaffolding Space Planning in Industrial Piping Construction Using Model-Based Simulation Programming by Jin, Haifeng, Nahangi, Mohammad, Goodrum, Paul M, Yuan, Yongbo

    Published in Journal of computing in civil engineering (01-01-2020)
    “…AbstractAs the main type of temporary structures, scaffolding systems have a significant impact on labor productivity and project cost in construction, but the…”
    Get full text
    Journal Article
  19. 19

    Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats by Dadi, Gabriel B, Goodrum, Paul M, Taylor, Timothy R. B, Carswell, C. Melody

    “…AbstractConstruction project performance is significantly reliant on the effective communication of the project’s design to the end construction worker…”
    Get full text
    Journal Article
  20. 20

    Activity Analysis for Direct-Work Rate Improvement in Construction by Gouett, Michael C, Haas, Carl T, Goodrum, Paul M, Caldas, Carlos H

    “…In the construction industry, on-site labor is one of the most variable and costly factors that affect project profits. Because of the variable nature of…”
    Get full text
    Journal Article