Search Results - "Gimadi E.Kh"
-
1
On some implementations of solving the resource constrained project scheduling problems
Published in Yugoslav Journal of Operations Research (01-01-2019)“…We consider a resource-constrained project scheduling problem with respect to the makespan minimization criterion. The problem accounts for technological…”
Get full text
Journal Article -
2
Combinatorial algorithms with performance guarantees for finding several Hamiltonian circuits in a complete directed weighted graph
Published in Discrete Applied Mathematics (11-12-2015)“…In this paper we present two new polynomial algorithms for the asymmetric version of the m-Peripatetic Salesman Problem (m-APSP) which consists in finding m…”
Get full text
Journal Article -
3
On the connectedness property of service areas for the Network Facility Location Problem
Published in Electronic notes in discrete mathematics (2001)“…The Network Facility Location Problem is considered. The central connectedness property of the transportation matrix is denned. For the problem with…”
Get full text
Journal Article -
4
On finding a cyclic tour and a vehicle loading plan yielding maximum profit
Published in Discrete Applied Mathematics (15-01-2004)“…We consider a problem in which it is required to find a cyclic tour and a vehicle loading plan maximizing the total profit realized from purchasing and selling…”
Get full text
Journal Article -
5
On the project scheduling problem under stored resource constraints
Published in ETFA 2001. 8th International Conference on Emerging Technologies and Factory Automation. Proceedings (Cat. No.01TH8597) (2001)“…For the resource constrained project scheduling problem (RCPSP) we introduce a notion of stored resources. Like it is for renewable resources, a predetermined…”
Get full text
Conference Proceeding