Search Results - "Ghomi, S"

Refine Results
  1. 1

    A survey of multi-factory scheduling by Behnamian, J., Fatemi Ghomi, S. M. T.

    Published in Journal of intelligent manufacturing (01-02-2016)
    “…Because of current globalization trend, production has shifted from the single factory production to multi-factory production network. To become competitive in…”
    Get full text
    Journal Article
  2. 2
  3. 3

    Stochastic mixed-model assembly line sequencing problem: Mathematical modeling and Q-learning based simulated annealing hyper-heuristics by Mosadegh, H., Fatemi Ghomi, S.M.T., Süer, G.A.

    Published in European journal of operational research (16-04-2020)
    “…•A new mathematical model is developed for stochastic mixed-model sequencing problem.•A new hyper simulated annealing is proposed employing reinforcement…”
    Get full text
    Journal Article
  4. 4

    A two-stage stochastic programming approach for value-based closed-loop supply chain network design by Badri, Hossein, Fatemi Ghomi, S.M.T., Hejazi, Taha-Hossein

    “…•A two-stage stochastic programming model is developed for value-based supply chain design.•A dynamic multi-commodity model is presented for making tactical…”
    Get full text
    Journal Article
  5. 5

    The impact of advertising and product quality on sales mode choice in the presence of private label by Hemmati, M., Fatemi Ghomi, S.M.T., Sajadieh, Mohsen S.

    “…The choice of selling format is a critical challenge that e-tailers and manufacturers encounter. Furthermore, with the increasing prevalence of e-commerce,…”
    Get full text
    Journal Article
  6. 6

    A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect by Hamta, Nima, Fatemi Ghomi, S.M.T., Jolai, F., Akbarpour Shirazi, M.

    “…This paper addresses multi-objective (MO) optimization of a single-model assembly line balancing problem (ALBP) where the operation times of tasks are unknown…”
    Get full text
    Journal Article
  7. 7

    Integrated multi-factory production and distribution scheduling applying vehicle routing approach by Marandi, Fateme, Fatemi Ghomi, S.M.T.

    “…This paper introduces a new integrated multi-factory production and distribution scheduling problem in supply chain management. This supply chain consists of a…”
    Get full text
    Journal Article
  8. 8

    Group layout design of manufacturing cells incorporating assembly and energy aspects by Forghani, Kamran, Fatemi Ghomi, S. M. T., Kia, Reza

    Published in Engineering optimization (04-05-2022)
    “…Cell Formation (CF) and Group Layout (GL) are two important problems in designing a cellular manufacturing system. This article addresses an integrated CF and…”
    Get full text
    Journal Article
  9. 9

    Designing a multi-objective closed-loop supply chain: a two-stage stochastic programming, method applied to the garment industry in Montréal, Canada by Shafiee Roudbari, Erfan, Fatemi Ghomi, S. M. T., Eicker, Ursula

    “…The global population continues to grow, which expands demand for raw materials. Meanwhile, governments are developing circular economy strategies within…”
    Get full text
    Journal Article
  10. 10

    Analysis of a time–cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process by Sadri, Shadi, Ghomi, S. M. T. Fatemi, Dehghanian, Amin

    Published in Annals of operations research (01-07-2024)
    “…Nowadays the advent of new types of projects such as startups, maintenance, and education make a revolution in project management, so that, classical project…”
    Get full text
    Journal Article
  11. 11

    Joint cell formation, cell scheduling, and group layout problem in virtual and classical cellular manufacturing systems by Forghani, Kamran, Fatemi Ghomi, S.M.T.

    Published in Applied soft computing (01-12-2020)
    “…Cell formation, cell scheduling, and group layout are three important problems in designing and configuring a Cellular Manufacturing System (CMS). This paper…”
    Get full text
    Journal Article
  12. 12

    Separate and bundling selling strategies for complementary products in a participative pricing mechanism by Hemmati, M., Fatemi Ghomi, S.M.T., Sajadieh, Mohsen S.

    Published in Computers & industrial engineering (01-03-2023)
    “…•Name-your-own-price (NYOP) mechanism for complementary products is proposed.•Two sales strategies, including the separate sale and bundling sale, are…”
    Get full text
    Journal Article
  13. 13

    Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates by Ebrahimi, M., Fatemi Ghomi, S.M.T., Karimi, B.

    Published in Applied mathematical modelling (01-05-2014)
    “…This paper studies the scheduling problem in hybrid flow shop (HFS) environment. The sequence dependent family setup time (SDFST) is concerned with…”
    Get full text
    Journal Article
  14. 14

    Prepositioning emergency earthquake response supplies: A new multi-objective particle swarm optimization algorithm by Mohammadi, R., Ghomi, S.M.T. Fatemi, Jolai, F.

    Published in Applied mathematical modelling (01-05-2016)
    “…•A multi-objective stochastic programming model is developed for pre-positioning and distributing emergency supply.•A new multi-objective particle swarm…”
    Get full text
    Journal Article
  15. 15

    A multi-echelon supply chain of deteriorating items with stock- and price-sensitive demand under consignment stock policy by Hemmati, M., Fatemi Ghomi, S. M. T., Sajadieh, Mohsen S.

    Published in Engineering optimization (04-03-2023)
    “…This article proposes a coordinated inventory model for a deteriorating item. The buyer side consists of the warehouse and shelf, and items deteriorate in both…”
    Get full text
    Journal Article
  16. 16

    Reverse logistics network design for product reuse, remanufacturing, recycling and refurbishing under uncertainty by Shafiee Roudbari, Erfan, Fatemi Ghomi, S.M.T., Sajadieh, Mohsen S.

    Published in Journal of manufacturing systems (01-07-2021)
    “…[Display omitted] •A new reverse logistics network with six various types of facilities designed.•Two stage stochastic condition with multi products is…”
    Get full text
    Journal Article
  17. 17

    A multivariate quantitative approach for sustainability performance assessment: An upstream oil and gas company by Salmanzadeh-Meydani, Navid, Ghomi, S. M. T. Fatemi, Haghighi, Seyedhamidreza Shahabi, Govindan, Kannan

    “…This paper presents a quantitative approach to evaluate the sustainability performance (SP) of an organization. A methodology is proposed based on principal…”
    Get full text
    Journal Article
  18. 18

    Multi-stage multi-product multi-period production planning with sequence-dependent setups in closed-loop supply chain by Torkaman, S., Fatemi Ghomi, S.M.T, Karimi, B.

    Published in Computers & industrial engineering (01-11-2017)
    “…•A multi-stage lot sizing problem with remanufacturing is modelled.•Sequence dependent setups and setup carry-over in a flow shop are considered.•A mixed…”
    Get full text
    Journal Article
  19. 19

    The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine by Behnamian, J., Fatemi Ghomi, S.M.T.

    Published in Information sciences (10-01-2013)
    “…Traditionally centralized manufacturing planning, scheduling, and control mechanisms are being found to be insufficiently flexible to respond to highly dynamic…”
    Get full text
    Journal Article
  20. 20

    Sudden-onset disaster resilience considering functionality improvement planning: An upstream oil and gas company by Salmanzadeh-Meydani, Navid, Ghomi, S.M.T. Fatemi, Haghighi, Seyedhamidreza Shahabi, Govindan, Kannan

    “…The present paper presents a quantitative approach to evaluate organizational resilience in sudden-onset disasters considering preparedness actions (PAs). The…”
    Get full text
    Journal Article