Closure of the Bureya River in April 2016 and Filling of the Plinth of the Lower Bureya Dam

At the preliminary design stage, the closure of the Bureya river was scheduled for October 20, 2015. The actual status of construction necessitated rescheduling the river closure for March 20, 2016, alteration of design discharges, 3D simulation, and adjustment of design solutions. The actual condit...

Full description

Saved in:
Bibliographic Details
Published in:Power technology and engineering Vol. 51; no. 3; pp. 274 - 280
Main Authors: Il’inskaya, A. I., Bobkov, A. V., Gara, V. S., Pareshnev, A. S., Petrov, V. V.
Format: Journal Article
Language:English
Published: New York Springer US 01-09-2017
Springer Nature B.V
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:At the preliminary design stage, the closure of the Bureya river was scheduled for October 20, 2015. The actual status of construction necessitated rescheduling the river closure for March 20, 2016, alteration of design discharges, 3D simulation, and adjustment of design solutions. The actual conditions of river closure on April 19, 2016 are described.
ISSN:1570-145X
1570-1468
DOI:10.1007/s10749-017-0824-x