Search Results - "Eritsyan, S. Kh"

  • Showing 1 - 5 results of 5
Refine Results
  1. 1

    Development and Implementation of Automatic Conversion of Steam-Gas Power Unit from Compound Cycle Mode to Steam-Power Mode Without Shutdown of the Unit by Anisimov, A. G., Mysak, I. S., Klub, M. V., Sargsyan, K. B., Eritsyan, S. Kh, Petrosyan, G. S., Avtandilyan, A. V., Gevorgyan, A. R.

    Published in Power technology and engineering (2018)
    “…Conversion of the power unit of station No. 5 of the Razdan thermoelectric power plant, which is not equipped with a bypass chimney, from a compound…”
    Get full text
    Journal Article
  2. 2

    Thermal and environmental characteristics of the primary equipment of the 480-MW Razdan-5 power-generating plant operating as a combined-cycle plant by Sargsyan, K. B., Eritsyan, S. Kh, Petrosyan, G. S., Avtandilyan, A. V., Gevorkyan, A. R., Klub, M. V.

    Published in Thermal engineering (2015)
    “…Results of thermal tests of 480-MW power-generating Unit 5 of Razdan Thermal Power Plant (hereinafter, Razdan-5 power unit) are presented. The tests were…”
    Get full text
    Journal Article
  3. 3

    Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine by Anisimov, A. G., Klub, M. V., Sargsyan, K. B., Eritsyan, S. Kh, Petrosyan, G. S., Avtandilyan, A. V., Gevorgyan, A. R.

    Published in Power technology and engineering (2016)
    “…The principles of starting up the steam power unit of the Hrazdan-5 fully fired combined-cycle power unit (Hrazdan, Armenia) are considered. This plant has…”
    Get full text
    Journal Article
  4. 4

    Experience gained with fitting the combined-cycle plant of unit 5 at the Razdan thermal power station with automated control systems by Rogachev, R. L., Ivanova, S. V., Sergeev, A. V., Kuznetsov, N. A., Sargsyan, K. B., Eritsyan, S. Kh, Voskanyan, V. S., Petrosyan, G. S., Antonyan, A. S.

    Published in Thermal engineering (2013)
    “…We describe the SPPA-T3000-based automated process control system developed in the course of retrofitting a standard 300-MW power unit into a combined-cycle…”
    Get full text
    Journal Article
  5. 5

    Modernization of the power unit no. 5 of the Razdan TPP with a gas-turbine topping according to a discharge arrangement by Karapetyan, K. V., Sargsyan, K. B., Eritsyan, S. Kh, Petrosyan, G. C., Avtandilyan, A. V., Mrktchyan, M. V., Arakelyan, A. A.

    Published in Thermal engineering (2012)
    “…We present the main reasons for reconstruction of the standard 300 MW power unit with K-300-240 steam turbine into the combined-cycle installation using an…”
    Get full text
    Journal Article