Search Results - "Dugardin, Frederic"

  • Showing 1 - 15 results of 15
Refine Results
  1. 1

    Exact method to optimize the total electricity cost in two-machine permutation flow shop scheduling problem under Time-of-use tariff by Ho, Minh Hung, Hnaien, Faicel, Dugardin, Frederic

    Published in Computers & operations research (01-08-2022)
    “…This study investigates the minimization of total electricity cost in a two-machine permutation flow shop scheduling problem under the most common electricity…”
    Get full text
    Journal Article
  2. 2

    Electricity cost minimisation for optimal makespan solution in flow shop scheduling under time-of-use tariffs by Ho, Minh Hung, Hnaien, Faicel, Dugardin, Frederic

    “…The industrial sector consumes half of the world delivered energy and is responsible for a third of carbon dioxide emissions which cause severe environmental…”
    Get full text
    Journal Article
  3. 3

    New multi-objective method to solve reentrant hybrid flow shop scheduling problem by Dugardin, Frédéric, Yalaoui, Farouk, Amodeo, Lionel

    Published in European journal of operational research (16-05-2010)
    “…This paper focuses on the multi-objective resolution of a reentrant hybrid flow shop scheduling problem (RHFS). In our case the two objectives are: the…”
    Get full text
    Journal Article
  4. 4

    Non-dominated Sorting Genetic Algorithms for a Multi-objective Resource Constraint Project Scheduling Problem by Wang, Xixi, Yalaoui, Farouk, Dugardin, Frédéric

    “…The resource constraint project scheduling problem (RCPSP) has attracted growing attention since the last decades. Precedence constraints are considered as…”
    Get full text
    Journal Article
  5. 5

    Forecasting the Emergency Department Patients Flow by Afilal, Mohamed, Yalaoui, Farouk, Dugardin, Frédéric, Amodeo, Lionel, Laplanche, David, Blua, Philippe

    Published in Journal of medical systems (01-07-2016)
    “…Emergency department (ED) have become the patient’s main point of entrance in modern hospitals causing it frequent overcrowding, thus hospital managers are…”
    Get full text
    Journal Article
  6. 6

    Open shop scheduling problem with a multi-skills resource constraint: a genetic algorithm and an ant colony optimisation approach by Campos Ciro, Guillermo, Dugardin, Frédéric, Yalaoui, Farouk, Kelly, Russell

    “…The continuous evolution of manufacturing environments leads to a more efficient production process that controls an increasing number of parameters…”
    Get full text
    Journal Article
  7. 7

    Genetic algorithms hybridized with the self controlling dominance to solve a multi-objective resource constraint project scheduling problem by Wang, Xixi, Yalaoui, Farouk, Dugardin, Frederic

    “…The Resource Constraint Project Scheduling Problem (RCPSP) is one of the most challenged scheduling topics. Compared to the other scheduling problems, the…”
    Get full text
    Conference Proceeding
  8. 8

    Fuzzy Lorenz Ant Colony System to solve multiobjective reentrant hybride flowshop scheduling problem by Dugardin, Frederic, Amodeo, Lionel, Yalaoui, Farouk

    “…This article deals with the multiobjective reentrant hybrid flowshop scheduling problem. In the latter several tasks has to be processed in a system and the…”
    Get full text
    Conference Proceeding
  9. 9

    Heuristic method for the hybrid flow shop problem in batch production by Lara, Andres Felipe Bernate, Yalaoui, Farouk, Dugardin, Frederic, Entzmann, Francoise

    “…This paper deals with a hybrid flow shop scheduling problem where the objective is to minimize total tardiness. Since the described shop is hybrid, each stage…”
    Get full text
    Conference Proceeding
  10. 10

    Multiobjective scheduling of a reentrant hybrid flowshop by Dugardin, F., Amodeo, L., Yalaoui, F.

    “…This paper deals with the multiobjective scheduling of a two stages reentrant hybrid flow shop. The system studied here is reentrant: jobs have to be processed…”
    Get full text
    Conference Proceeding
  11. 11

    FLC-archive to solve multiobjective reentrant hybride flowshop scheduling problem by Dugardin, F, Amodeo, L, Yalaoui, F

    “…This article deals with the multiobjective reentrant hybrid flowshop scheduling problem. In the latter several tasks has to be processed in a system and the…”
    Get full text
    Conference Proceeding
  12. 12

    Méthodes multi-objectifs pour l'ordonnancement de lignes réentrantes by Dugardin, Frédéric, Amodeo, Lionel, Yalaoui, Farouk

    Published in Journal of decision systems (01-01-2009)
    “…This article presents the scheduling of a reentrant maintenance line with parallel machine stages. In this study the system is composed of machines with their…”
    Get full text
    Journal Article
  13. 13

    Méthodes multi-objectifs pour l’ordonnancement de lignes réentrantes by Dugardin, Frédéric, Amodeo, Lionel, Yalaoui, Farouk

    Published in Journal of decision systems (18-04-2012)
    “…This article presents the scheduling of a reentrant maintenance line with parallel machine stages. In this study the system is composed of machines with their…”
    Get full text
    Journal Article
  14. 14

    Méthodes multi-objectifs pour l'ordonnancement de lignes réentrantes by DUGARDIN, Frédéric, AMODEO, Lionel, YALAOUI, Farouk

    Published in Journal of decision systems (01-04-2009)
    “…Positionnement du problème Les problèmes d'ordonnancement d'atelier à caractère réentrant peuvent être modélisés de deux manières différentes : soit…”
    Get full text
    Journal Article
  15. 15

    Buffers sizing in assembly lines using a Lorenz multiobjective ant colony optimization algorithm by Chehade, H, Yalaoui, F, Amodeo, L, Dugardin, F

    “…In this paper, a new multiobjective resolution approach is proposed for solving buffers sizing problems in assembly lines. The considered problem consists of…”
    Get full text
    Conference Proceeding