Search Results - "Detoma, Edoardo"

  • Showing 1 - 6 results of 6
Refine Results
  1. 1

    Exploitation of GNSS signals as illuminators of opportunity in Passive Coherent Location (PCL) systems by Detoma, Edoardo

    “…A conventional radar transmits a radio signal and receives back the signal reflected from the target. The distance is estimated by measuring the propagation…”
    Get full text
    Conference Proceeding
  2. 2

    Hybrid fault detection technique in assisted GNSS by Ghinamo, Giorgio, Boiero, Gianluca, Lovisolo, Piero, Dalla Torre, Andrea, Detoma, Edoardo

    “…High sensitivity GNSS receivers tracking weak signals have been developed for indoor applications and to operate in urban canyons. They allow tracking GNSS…”
    Get full text
    Conference Proceeding
  3. 3

    An Ultra Stable Oscillator for the 3GM experiment of the JUICE mission by Shapira, Aviv, Stern, Avinoam, Prazot, Shemi, Mann, Rony, Barash, Yefim, Detoma, Edoardo, Levy, Benny

    “…An Ultra Stable Oscillator is being developed by AccuBeat (named USO) for the Gravity and Geophysics of Jupiter and the Galilean Moons (3GM) radio occultation…”
    Get full text
    Conference Proceeding
  4. 4

    Precise time and frequency distribution over a wireless network for A-GNSS users by Detoma, E., Capetti, P., Pielmeier, J., Maltzahn, U., Risueno, G.L.

    “…Assisted-GNSS (A-GNSS) is an innovative technology intended to allow the use of GNSS (Global Navigation Satellite Systems) signals indoor or in environments in…”
    Get full text
    Conference Proceeding
  5. 5

    The Galileo Precise Timing Facility by Zanello, R., Mascarello, M., Tavella, P., Galleani, L., Detoma, E., Bellotti, A.

    “…Consorzio Torino Time (CTT) is conducting the C / D / El phase for the implementation of the Precise Timing Facility (PTF) Element, part of the Galileo Mission…”
    Get full text
    Conference Proceeding
  6. 6

    Implementing the Galileo Precise Timing Facility by Zanello, R., Blanchi, M., Piras, C., Detoma, E., Capetti, P., Bellotti, A., Villabruna, D.

    “…The precise timing facility (PTF) is an element of the Galileo Mission Segment. It is being developed by the following partners Consorzio Torino Time (CTT):…”
    Get full text
    Conference Proceeding