Search Results - "Chua, T.J."
-
1
A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem
Published in Information sciences (15-06-2011)“…In this paper, a discrete artificial bee colony (DABC) algorithm is proposed to solve the lot-streaming flow shop scheduling problem with the criterion of…”
Get full text
Journal Article -
2
Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling
Published in Information sciences (24-12-2014)“…This paper proposes a Pareto-based grouping discrete harmony search algorithm (PGDHS) to solve the multi-objective flexible job shop scheduling problem (FJSP)…”
Get full text
Journal Article -
3
Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectives
Published in Journal of intelligent manufacturing (01-04-2016)“…Flexible job-shop scheduling problem (FJSP) is a practically useful extension of the classical job shop scheduling problem. This paper proposes an effective…”
Get full text
Journal Article -
4
Dynamic operations and manpower scheduling for high-mix, low-volume manufacturing
Published in 2008 IEEE International Conference on Emerging Technologies and Factory Automation (01-09-2008)“…The shop floor of a Precision Engineering (PE) company is a typical high-mix low-volume job shop environment in which jobs with variable routings are being…”
Get full text
Conference Proceeding -
5
A heuristic approach for scheduling multi-chip packages for semiconductor backend assembly
Published in 2007 IEEE Conference on Emerging Technologies and Factory Automation (EFTA 2007) (01-09-2007)“…The processes in which the multi-chip packages (MCP) positions the multiple dies to one lead frame pose great challenges to production scheduling in the…”
Get full text
Conference Proceeding -
6
Common Capacity Modelling for Multi-Site Planning: Case Studies
Published in 2007 IEEE Conference on Emerging Technologies and Factory Automation (EFTA 2007) (01-09-2007)“…Capacity planning is a pivotal activity that is in compliance with company's long-term business goals, meanwhile also guides the short-term production…”
Get full text
Conference Proceeding -
7
A Heuristics-based Advanced Planning and Scheduling System with Bottleneck Scheduling Algorithm
Published in 2006 IEEE Conference on Emerging Technologies and Factory Automation (01-09-2006)“…This paper presents a heuristics-based advanced planning and scheduling (APS) system with bottleneck scheduling algorithm. It has been designed to solve…”
Get full text
Conference Proceeding -
8
Practical lot release methodology for semiconductor back-end manufacturing
Published in Production planning & control (01-04-2005)“…This paper presents a new method and system that has been developed to solve production lot release problems in a discrete semiconductor back-end manufacturing…”
Get full text
Journal Article -
9
APS, ERP and MES systems integration for semiconductor backend assembly
Published in 7th International Conference on Control, Automation, Robotics and Vision, 2002. ICARCV 2002 (2002)“…In this paper, the system integration of an Advanced Planning and Scheduling (APS) system with Enterprise Resource Planning (ERP) and Manufacturing Execution…”
Get full text
Conference Proceeding