Search Results - "Chernomzav, I. Z."
-
1
The Effect of Shafting Oscillations in the Turbo Unit on the Accuracy of Rotation Frequency Measurement
Published in Power technology and engineering (2022)“…An analysis of the influence produced by torsional and bending oscillations of a shaft assembly on the accuracy of measuring rotation frequency is presented…”
Get full text
Journal Article -
2
Analysis of the Dynamic Characteristics of Options for the Automatic Load-Frequency Control System of 800 MW Power Unit 1 of the Perm TPP Islanded to Energize a Power District
Published in Power technology and engineering (2020)“…The results of using a mathematical model to study advanced algorithms for the automatic load-frequency control (ALFC) system of 800 MWPower Unit 1 of the Perm…”
Get full text
Journal Article -
3
Standard Control System for the PJSC “Turboatom” K-300-240 Turbine
Published in Power technology and engineering (01-03-2018)“…Fundamental solutions for improvement of the hydraulic section of the control system for the PJSC “Turboatom” K-300-240 turbine, which is equipped with a…”
Get full text
Journal Article -
4
The system for automatically controlling the processes in a GTE-110, Russia’s first high-temperature large-capacity gas turbine
Published in Thermal engineering (2008)“…The tasks imposed on the control of the GTE-110 gas turbine unit are considered together with the results of experiments carried out at a test rig and on the…”
Get full text
Journal Article -
5
Adapting the monitoring and control systems on the 300 MW power generation units at the Iriklinskaya GRÉS to modern operational requirements
Published in Power technology and engineering (01-05-2009)“…Work done by JSC “Interavtomatika” and the Iriklinskaya GRÉS (State Regional Electric Power Plant) to create automatic frequency and power control systems is…”
Get full text
Journal Article -
6
EXPERIENCE AND PROBLEMS IN THE DEVELOPMENT AND IMPLEMENTATION I C OF CCPP AT POWER PLANTS OF RUSSIA AND BELARUS
Published in Doklady Belorusskogo gosudarstvennogo universiteta informatiki i radioèlektroniki (01-06-2019)“…Summed up the experience of the development and implementation I&C of CCPP by the company «Interavtomatika» AG on various types of CCPP. For example, the I&C…”
Get full text
Journal Article -
7
IMPROVEMENT OF STEAM TURBINE NUCLEAR POWER PLANTS CONTROL SYSTEMS AND AUTOMATION TURBINE BUILDINGS EQUIPMENT OF RUSSIA NUCLEAR POWER PLANTS
Published in Doklady Belorusskogo gosudarstvennogo universiteta informatiki i radioèlektroniki (01-06-2019)“…Typical structure of closed-loop control for steam turbine К-1000-60/3000, designed and implemented by «Interavtomatika» at the unit 4 Kalinin NPP are shown. A…”
Get full text
Journal Article -
8
Experience of development and implementation of new electrohydraulic turbine control systems of the Leningrad Metal Plant for nuclear power plants
Published in Thermal engineering (2013)“…An experience of development and implementation of electrohydraulic control systems with the application of microprocessor systems is considered by the example…”
Get full text
Journal Article -
9
Participation of a PGU-325 in frequency primary control
Published in Thermal engineering (2013)“…Engineering features of the main machinery for a PGU-325 power generating unit of plant no. 2 of the Ivanovskie combined cycle plants (CCPs) are given. Based…”
Get full text
Journal Article -
10
Improvement of automatic control systems for large-capacity steam turbines
Published in Thermal engineering (2008)“…We present the structures of microprocessor-based control systems we have developed for steam turbines. We also present the results from tests carried out on…”
Get full text
Journal Article -
11
Improvement of Automatic Control Systems for Large-Capacity Steam Turbines
Published in Thermal engineering (2008)Get full text
Journal Article -
12
Process Control System for the Test Bay of GTE-110
Published in Power technology and engineering (15-07-2003)“…An automatic system consisting of main and auxiliary equipment for controlling a gas-turbine unit is presented. Tests confirming realization of all the…”
Get full text
Journal Article