Search Results - "CIRULIS, MARIS"
-
1
Design and construction of a snowfall protection structure on the Baku-Tbilisi-Kars rail corridor, Georgia
Published in Structural engineer (London, England : 1988) (01-08-2019)“…This project involved the design and construction of a structure comprising four tunnels with a total length of 2434m. An initial in situ concrete scheme was…”
Get full text
Journal Article -
2
Design and construction of a snowfall protection structure on the Baku-Tbilisi-Kars rail corridor, Georgia
Published in Structural engineer (London, England : 1988) (01-08-2019)“…This project involved the design and construction of a structure comprising four tunnels with a total length of 2434m. An initial in situ concrete scheme was…”
Get full text
Journal Article -
3