Search Results - "Blackhurst, E. J."
-
1
The C-Band All-Sky Survey (C-BASS): design and implementation of the northern receiver
Published in Monthly notices of the Royal Astronomical Society (01-03-2014)“…The C-Band All-Sky Survey is a project to map the full sky in total intensity and linear polarization at 5 GHz. The northern component of the survey uses a…”
Get full text
Journal Article -
2
The C-Band All-Sky Survey (C-BASS): Design and implementation of the northern receiver
Published 03-12-2013“…The C-Band All-Sky Survey (C-BASS) is a project to map the full sky in total intensity and linear polarization at 5 GHz. The northern component of the survey…”
Get full text
Journal Article -
3
Design, development and verification of the 30 and 44 GHz front-end modules for the Planck Low Frequency Instrument
Published 26-01-2010“…R J Davis et al 2009 JINST 4 T12002 We give a description of the design, construction and testing of the 30 and 44 GHz Front End Modules (FEMs) for the Low…”
Get full text
Journal Article -
4
LNA noise behaviour below 10K physical temperature
Published in 2012 7th European Microwave Integrated Circuit Conference (01-10-2012)“…We present early results of noise temperature measurements made on a Planck LFI EBB Ka-band low noise amplifier at physical temperatures as low as 1.5 K. This…”
Get full text
Conference Proceeding