Search Results - "Bak, S. J."

Refine Results
  1. 1

    Design features of the KSTAR in-vessel control coils by Kim, H.K., Yang, H.L., Kim, G.H., Kim, Jin-Yong, Jhang, Hogun, Bak, J.S., Lee, G.S.

    Published in Fusion engineering and design (01-06-2009)
    “…In-vessel control coils (IVCCs) are to be used for the fast plasma position control, field error correction (FEC), and resistive wall mode (RWM) stabilization…”
    Get full text
    Journal Article Conference Proceeding
  2. 2

    Effect of Al pre-deposition on AlN buffer layer and GaN film grown on Si (111) substrate by MOCVD by Bak, S. J., Mun, D. -H., Jung, K. C., Park, J. H., Bae, H. J., Lee, I. W., Ha, J. -S., Jeong, T., Oh, T. S.

    Published in Electronic materials letters (01-05-2013)
    “…In this study, we investigated the effect of Al pre-deposition time on GaN crystal quality. The GaN layer was grown on a Si (111) substrate by metal organic…”
    Get full text
    Journal Article
  3. 3

    Quench Detection Based on Voltage Measurement for the KSTAR Superconducting Coils by Yong Chu, Yonekawa, H., Kim, Y.O., Park, K.R., Hyun Jung Lee, Park, M.K., Park, Y.M., Lee, S.J., Ha, T.H., Oh, Y.K., Bak, J.S.

    “…To protect the KSTAR (Korea Superconducting Tokamak Advanced Research) superconducting coils against a quench, the quench detection system based on voltage…”
    Get full text
    Journal Article Conference Proceeding
  4. 4

    Manufacture and test of mock-up for ITER thermal shield by Noh, C.H., Nam, K., Chung, W., Kang, D.K., Kim, B.C., Utin, Y., Ioki, K., Her, N.I., Yu, J., Ahn, H.J., Bak, J.S., Jung, K.J.

    Published in Fusion engineering and design (01-12-2010)
    “…ITER thermal shield, which is to be fully made by Korea, is very large system and its tolerance requirement is so tight that the precise design and manufacture…”
    Get full text
    Journal Article Conference Proceeding
  5. 5

    Progress of detailed design and supporting analysis of ITER thermal shield by Nam, K., Noh, C.H., Chung, W., Kim, B.C., Utin, Y., Ioki, K., Her, N.I., Yu, J., Ahn, H.J., Bak, J.S., Jung, K.J.

    Published in Fusion engineering and design (01-12-2010)
    “…The detailed design of ITER thermal shield (TS), which is planned to be procured completely by Korea, has been implemented since 2007. In this paper, the…”
    Get full text
    Journal Article Conference Proceeding
  6. 6

    Design analysis of the hinge support for the ITER vacuum vessel by Kim, B.Y., Ahn, H.J., Ha, M.S., Kim, Y.K., Kim, H.S., Sa, J.W., Kim, B.C., Bak, J.S., Choi, C.H., Ioki, K., Wang, X., Bachmann, C.

    Published in Fusion engineering and design (01-10-2011)
    “…In order to verify design feasibility and structural integrity of a hinge type support for the ITER VV support system, the design analysis has been performed…”
    Get full text
    Journal Article Conference Proceeding
  7. 7

    Status of ITER procurement activities in Korea by Jung, K.J., Kwon, S.P., Lee, H.G., Bak, J.S., Lee, G.S.

    Published in Fusion engineering and design (01-12-2010)
    “…The Republic of Korea is participating in the ITER project as a full member and procuring components for the ITER tokamak and its facility. This paper presents…”
    Get full text
    Journal Article Conference Proceeding
  8. 8

    Analysis of the Helium Behavior Due to AC Losses in the KSTAR Superconducting Coils by Park, Y M, Lee, H J, Lee, Y J, Park, S H, Kwag, S W, Song, N H, Chang, Y B, Park, H T, Woo, I S, Bang, E N, Kim, Y S, Yang, H L, Bak, J S, Kwon, M

    “…The KSTAR superconducting magnetic coils, which are made of cable in-conduit conductor (CICC), maintain a superconducting state with forced-flow supercritical…”
    Get full text
    Journal Article Conference Proceeding
  9. 9

    Wall conditioning of the KSTAR vacuum vessel by Kim, K.M., Yang, H.L., Hong, S.H., Kim, S.T., Kim, H.T., Kim, K.P., Lee, K.S., Kim, H.K., Bak, J.S.

    Published in Fusion engineering and design (01-06-2009)
    “…The wall conditioning of the KSTAR vacuum vessel has been performed in order to remove various kinds of impurities including H 2O, carbon and oxygen for the…”
    Get full text
    Journal Article Conference Proceeding
  10. 10

    Helium refrigeration system for the KSTAR by Choi, C.H., Chang, H.-S., Park, D.S., Kim, Y.S., Bak, J.S., Lee, G.S., Kwon, I.K., Kim, H.M., Cho, M.C., Kim, H.-S., Fauve, E., Abe, I., Briend, P., Bernhardt, J.-M., Cardet, Y., Dauguet, P., Beauvisage, J., Andrieu, F., Yang, S.-H., Gistau Baguer, G.M.

    Published in Fusion engineering and design (01-11-2006)
    “…The KSTAR, a tokamak with fully superconducting (SC) magnets, is under construction in the National Fusion Research Center (NFRC). For the proper operation of…”
    Get full text
    Journal Article Conference Proceeding
  11. 11

    Completion of the KSTAR construction and its role as ITER pilot device by Oh, Yeong-Kook, Yang, H.L., Kim, Y.S., Park, K.R., Kim, W.C., Park, M.K., Park, Y.M., Cho, K.W., Choi, J.W., Kim, J.Y., Na, H.K., Bae, Y.S., Bak, J.S., Kwon, M., Lee, G.S.

    Published in Fusion engineering and design (01-12-2008)
    “…The construction of the Korea Superconducting Tokamak Advanced Research (KSTAR) device has been completed by August 2007. Key achievements in the KSTAR…”
    Get full text
    Journal Article Conference Proceeding
  12. 12

    Fabrication of the KSTAR vacuum vessel and ports by Kim, B.C., Her, N.I., Hong, K.H., Kim, G.H., Bak, J.S.

    Published in Fusion engineering and design (01-05-2008)
    “…The construction of the steady-state-capable superconducting KSTAR tokamak is in close proximity to the finalization. As one of the main components of the…”
    Get full text
    Journal Article
  13. 13

    Construction and Commissioning Results of the KSTAR Current Lead System by Song, N H, Lee, Y J, Park, Y M, Lee, H J, Park, S H, Woo, I S, Kwag, S W, Chang, Y B, Park, H T, Lim, H T, Yang, H L, Bak, J S, Kwon, M

    “…The KSTAR current lead system (CLS) was commissioned during the first campaign of the plasma experiments. The current lead system is divided into a toroidal…”
    Get full text
    Journal Article Conference Proceeding
  14. 14

    Fabrication study on the cooling module of the ITER neutral beam duct liner by Sa, J.W., Kim, H.S., Kim, B.Y., Kim, B.C., Ahn, H.J., Bak, J.S., Jung, H.J., Han, M.H., Hong, C.D., Lee, J.S., Kim, Y.K., Urbani, M., Geli, F.

    Published in Fusion engineering and design (01-12-2010)
    “…Recently the new concept of the ITER neutral beam (NB) duct liner has been developed to improve thermo-mechanical performance and satisfy the requirements for…”
    Get full text
    Journal Article Conference Proceeding
  15. 15

    KSTAR thermal shield by Kim, G.H., Kim, W.C., Yang, H.L., Bang, E.N., Kim, K.P., Lee, K.S., Kim, H.T., Kim, Y.S., Bak, J.S., Kang, D.K., Lee, Y.S.

    Published in Fusion engineering and design (01-06-2009)
    “…The thermal shield intercepts thermal radiation from the components at room temperature to superconducting magnet at 4.5 K. The thermal shield of KSTAR is…”
    Get full text
    Journal Article Conference Proceeding
  16. 16

    Overview of the KSTAR vacuum pumping system by Kim, K.P., Lee, K.S., Yang, H.L., Kim, M.K., Kim, H.K., Kim, G.H., Kim, K.M., Kim, H.T., Kim, K.H., Park, M.K., Oh, Y.K., Bak, J.S.

    Published in Fusion engineering and design (01-06-2009)
    “…The installation of the Korea Superconducting Tokamak Advanced Research (KSTAR) device vacuum pumping system for both the vacuum vessel and the cryostat was…”
    Get full text
    Journal Article Conference Proceeding
  17. 17

    Construction and Commissioning of the KSTAR Helium Distribution System by Lee, Y.J., Park, Y.M., Kim, Y.S., Jang, H.S., Kwag, S.W., Chang, Y.B., Park, H.T., Woo, I.S., Song, N.H., Bang, E.N., Ha, T.H., Baek, S., Kim, M.K., Kim, W.C., Oh, Y.K., Bak, J.S.

    “…The KSTAR components requiring cryogenic helium coolant for superconducting magnet operations are connected to the helium refrigeration system (HRS) through…”
    Get full text
    Journal Article Conference Proceeding
  18. 18

    Construction and Commissioning of the KSTAR Current Feeder System by Park, Y.M., Lee, Y.J., Yaung-Soo Kim, Woo, I.S., Kwag, S.W., Chang, Y.B., Song, N.H., Park, H.T., Kim, C.S., Lee, K.S., Bang, E.N., Chu, Y., Yonekawa, H., Park, K.R., Yang, H.L., Ha, T.H., Bak, J.S.

    “…The function of the current feeder system (CFS) is for conducting large currents from the power supplies to the KSTAR superconducting (SC) magnets. The CFS…”
    Get full text
    Journal Article Conference Proceeding
  19. 19

    KSTAR Magnetic Field Measurement During the Commissioning and Remanent Field Evaluation by Yonekawa, H., Kim, Y.O., Hyun Jung Lee, Yoon, S.W., Hahn, S.H., Lee, K.S., Lee, D.K., Soo Hwan Park, Yong Chu, Bang, E.N., Park, K.R., Oh, Y.K., Bak, J.S., Leuer, J.A.

    “…An in situ measurement of the magnetic field generated by the assembled superconducting magnet coils was held by using precision Hall sensors during the…”
    Get full text
    Journal Article Conference Proceeding
  20. 20

    Qualification Test Results of the KSTAR Superconducting Coils From the Construction to the Commissioning Steps by Park, K.R., Yong Chu, Yonekawa, H., Baang, E.N., Kim, Y.O., Hyun Jung Lee, Park, Y.M., Lee, Y.J., Chang, H.S., Lee, D.K., Choi, J.H., Park, S.H., Hahn, S.H., Kim, K.H., Hwang, I.S., Park, M.K., Cho, K.W., Kim, Y.S., Oh, Y.K., Bak, J.S.

    “…To achieve the first plasma of the Korea superconducting tokamak advanced research (KSTAR), the KSTAR superconducting coils were tested in advance. As they…”
    Get full text
    Journal Article Conference Proceeding